Efficient and widely available transport infrastructure is one of the most important prerequisites for sustainable economic development to meet the demand for mobility. In this context, being able to manage traffic growth forecasts is of particular importance. In Germany, current forecasts indicate a 40% increase in rail and road transport in the country. However, about 60% of bridges (as measured by bridge area) on the national German highway system that are suitable for freight transport were built before 1985. In other transport sectors as well, aging infrastructure is one of the key challenges for the availability and the resilience of European transport infrastructure. Many bridges in the national German highway system are already at their load-bearing limit. Furthermore, required maintenance measures have not been adequately carried out in the past due to limited budgets, leading to overall bridge deterioration. Further challenges for owners and operators of transport infrastructure result from the effects of climate change, associated climate extremes, natural catastrophes, and possible criminal and terrorist threats. To ensure that future infrastructure challenges can be successfully addressed, strategies and solutions must be developed and implemented in a timely manner to enable holistic and sustainable life-cycle management. The concepts of Resilience Management as well as Resilience Engineering are essential building blocks in this process. Resilience is the ability to survive in the face of a complex, uncertain, and ever-changing future. It is a way of thinking about both short-term cycles and long-term trends. Using this concept, owners and operators can reduce the risk of disruption in the face of shocks and stresses. Resilience requires cyclical, proactive, and holistic risk management practices.
In future, additional and more detailed data are needed about the current conditions of bridges for preventive maintenance management. Monitoring procedures are not merely able to provide key performance indicators for a specific point in time, but also over a period. These KPIs must be selected in such a way as to permit substantiated statements about the present and future condition of bridges. For this reason, greater efforts must be made to define the significant KPIs for the various types of bridges, and show how these figures can be reliably determined. Both the COST Action TU1402, and TU1406 offer important approaches which, properly combined, can deliver substantial added value to the calculation and description of the condition of bridges in the interest of proactive maintenance management.
The current maintenance management for bridges is mainly based on visual inspection and aims at the repair of identified damages. In the project cluster "Smart Bridge" an adaptive system for holistic evaluation in real time is developed. The following pilot studies show significant aspects of the Smart Bridge. Within the research project "Digital Test Area Autobahn" a new constructed prestressed concrete bridge is implemented with instrumented expansion joints and bearings, a "RTMS©" and a sensor network. By using analytical bridge models and evaluation methods the condition and reliability of the bridge as well as the remaining service life is determined. In the pilot study "duraBASt" sensors for the detection of durability and structural safety as well as data analyzing and evaluation procedures are investigated. The aim of this study is the partial implementation of the aspects: data collection, data processing and model development for condition assessment of the bridge.
The case study "Digital Test Area Autobahn" is presented. A new built (September 2016) pre-stressed concrete bridge is equipped with different monitoring systems for the detection of traffic load, climatic influence and the reaction of the bridge. Possibilities for the implementation of a VoI (Value of Information) analyses are presented.
Fire incidents are among the most relevant for people in a tunnel. Therefore, it is important to be sufficiently prepared for such events. A large scale fire test is to be used to help evaluate the initial burning duration and the time it takes for the fire to spread to other vehicles in the tunnel, and in particular how long it takes for a truck carrying wooden pallets to catch fire, taking into consideration the extremely high temperatures. The goal, therefore, is to determine the time it takes for a fire to spread to other vehicles in the tunnel. In the large scale fire test, an accident in a tunnel with one-way traffic is simulated between a truck loaded with approximately 3.7 t of wooden Europol pallets and a passenger car. Directly behind each of the vehicles involved in the accident there is another car which stops at a distance of 1.0 m. Approximately 300 litres of burning diesel are discharged from the truck's fuel tank, which is simulated by using approximately 400 litres of isopropanol. A 10 m-² burning pool forms underneath the truck. Other objectives of the large scale fire test are the validation of the CFD models and the evaluation of the progression of the thermal release ratios estimated for the simulation. The thermal release ratios generated in the test are determined and evaluated using various models.
Risk-based approach for the protection of land transport infrastructure against extreme rainfall
(2016)
The aim of the research project "Risk based approach for the protection of transport infrastructure against extreme rainfall RAINEX" is the development of a practical methodology for the identification and assessment of both vulnerable as well as critical transport infrastructures towards extreme rainfall events consequences. The developed methodology is based on expert knowledge and includes qualitative and semi-quantitative analyses regarding the assessment of the vulnerability and criticality of relevant transport infrastructures. The process chain from the spatial rainfall to the concentrated runoff in the river channel was shown to assess the local hazard resulting in the local risk. The main result of the project is a practice-oriented and applicable methodology and a comprehensive and well-developed security handbook.
This paper deals with the determination of test criteria for the durability assessment of polyvinyl chloride (PVC)-based geosynthetic barriers (GBR-P) products in tunnel sealing systems. In the project different products for road tunnel application are investigated by systematic long time storage in hot water using a new test procedure based on SIA V 280 standard (test no. 13) and EN 14415. The objective of this research project is to derive suitable exposure conditions and criteria for a practical testing procedure with regard to service lifetimes of up to 100 years. For that test temperature and time as well as the best suitable test medium have been investigated in a structured way. To verify the results of the new test procedure the material properties of GBR-P samples removed from older road tunnels are investigated. Based on the presented results of the still on-going research program some preliminary conclusions regarding the updating of the German regulations for road tunnel sealing systems (ZTV-ING part 5 section 5 and TL/TP KDB) are given.
In the project SECMAN " SECurity MANual " a simple four-step procedure for the identification of critical road infrastructures, assessment of these infrastructures regarding various man-made threats and the determination of effective protection measures was developed. These methodologies are summarized and combined into a comprehensive best-practice manual which allows for a trans-national structured and holistic security-risk-management approach for owners and operators of road infrastructures in Europe. This paper presents the developed methodology starting from the assessment procedures of a network's criticality over an object's attractiveness and vulnerability to the selection process of appropriate protection measures.
In Germany road tunnels on major roads which are longer than 400 m have to be monitored permanently. For that purpose the tunnels are equipped with a multitude of monitoring and detection systems whose data and messages are transmitted to tunnel control centres. Due to the higher traffic density, the increasing number of tunnels to be monitored and road users" demand of higher safety and security levels, the strains on operating staff of tunnel control centres have continuously been growing. Therefore, innovative approaches have been developed in two recent German research projects: RETISS " Real Time Security Management System, and ESIMAS " Real-time Safety Management System for road Tunnels. Both systems are designed to allow faster and more efficient reaction of tunnel operators in order to maintain the capacity and availability of transport infrastructures but also to improve the safety and security of road users.
Improving the security of critical road infrastructure is a major task for owners and operators of tunnels and bridges in the European TEN-T Network (Trans-European Networks of Transport) (European Parliament and Council 1996). Up to now, there has not been a systematic procedure for identifying and assessing critical infrastructure objects and selecting appropriate protection measures. The EC FP7 project SeRoN for the first time presents an innovative methodology in order to support road owners and operators in handling this complex task. This paper describes the methodology and project results in detail by giving an introduction into its practical application.