Sonstige
Filtern
Erscheinungsjahr
- 2016 (69) (entfernen)
Dokumenttyp
- Buch (Monographie) (37)
- Wissenschaftlicher Artikel (16)
- Konferenzveröffentlichung (10)
- Teil eines Buches (Kapitel) (3)
- Bericht (3)
Schlagworte
- Deutschland (38)
- Forschungsbericht (38)
- Germany (37)
- Research report (37)
- Bewertung (23)
- Evaluation (assessment) (21)
- Brücke (13)
- Bridge (12)
- Verfahren (10)
- Method (9)
- Nachhaltige Entwicklung (9)
- Prüfverfahren (9)
- Sustainability (9)
- Test method (9)
- Richtlinien (8)
- Test (8)
- Versuch (8)
- Beton (7)
- Concrete (7)
- Lebenszyklus (7)
- Life cycle (7)
- Planning (7)
- Planung (7)
- Reinforcement (in mater) (7)
- Safety (7)
- Sicherheit (7)
- Specifications (7)
- Transport infrastructure (7)
- Verbesserung (7)
- Verkehrsinfrastruktur (7)
- Bemessung (6)
- Bewehrung (6)
- Design (overall design) (6)
- Improvement (6)
- Reinforced concrete (6)
- Stahlbeton (6)
- Bauwerk (5)
- Boden (5)
- Engineering structure (5)
- Instandsetzung (5)
- Quality (5)
- Qualität (5)
- Repair (5)
- Soil (5)
- Tunnel (5)
- Autobahn (4)
- Baustoff (4)
- Berechnung (4)
- Bindemittel (4)
- Binder (4)
- CEN (4)
- Calculation (4)
- Conference (4)
- Decision process (4)
- Development (4)
- Ecobalance (4)
- Entscheidungsprozess (4)
- Entwicklung (4)
- Ermüdung (mater) (4)
- Fatigue (mater) (4)
- Festigkeit (4)
- Forecast (4)
- Forschungsarbeit (4)
- Highway design (4)
- Impact study (4)
- Konferenz (4)
- Material (constr) (4)
- Modification (4)
- Prestressed concrete (4)
- Prognose (4)
- Road construction (4)
- Road network (4)
- Spannbeton (4)
- Straßenbau (4)
- Straßennetz (4)
- Strength (mater) (4)
- Weather (4)
- Witterung (4)
- Ökobilanz (4)
- Apparatus (measuring) (3)
- Asphaltoberbau (3)
- Auftrag (3)
- Contract (3)
- Cost (3)
- Cost benefit analysis (3)
- Cracking (3)
- Damage (3)
- Dauerhaftigkeit (3)
- Durability (3)
- Earthworks (3)
- Efficiency (3)
- Emission (3)
- Environment (3)
- Erdarbeiten (3)
- Fuge (3)
- Full depth asphalt pavement (3)
- Joint (structural) (3)
- Kapazität (Straße) (3)
- Kosten (3)
- Laboratorium (3)
- Laboratory (not an organization) (3)
- Landstraße (3)
- Leistungsfähigkeit (allg) (3)
- Maintenance (3)
- Messgerät (3)
- Metal bridge (3)
- Metallbrücke (3)
- Motorway (3)
- Prevention (3)
- Research project (3)
- Risikobewertung (3)
- Risk assessment (3)
- Rissbildung (3)
- Rural road (3)
- Sachschaden (3)
- Straßenentwurf (3)
- Telematics (3)
- Telematik (3)
- Traffic control (3)
- Umwelt (3)
- Unterhaltung (3)
- Verkehrssteuerung (3)
- Wirtschaftlichkeitsrechnung (3)
- Adhesion (2)
- Adhäsion (2)
- Administration (2)
- Aggregate (2)
- Anpassung (allg) (2)
- Arbeitsgruppe (2)
- Auslaugung (2)
- Ausschreibung (2)
- Bau (2)
- Baustelle (2)
- Bearing capacity (2)
- Behaviour (2)
- Belastung (2)
- Beschilderung (2)
- Betonstraße (Oberbau) (2)
- Bitumen (2)
- Capacity (road, footway) (2)
- Cement (2)
- Classification (2)
- Climate change (2)
- Concentration (chem.) (2)
- Condition survey (2)
- Construction (2)
- Cyclist (2)
- Datenverarbeitung (2)
- Decke (Straße) (2)
- Decrease (2)
- Digital model (2)
- Driver (2)
- Driving (veh) (2)
- Durchlässigkeit (2)
- Electric vehicle (2)
- Elektrofahrzeug (2)
- Fahrer (2)
- Fahrstreifen (2)
- Fahrzeug (2)
- Fahrzeugführung (2)
- Financing (2)
- Finanzierung (2)
- Geologie (2)
- Gestaltung (2)
- Highway (2)
- Impact study (environment) (2)
- Improvements (2)
- Information (2)
- Information documentation (2)
- Injury (2)
- Intelligent transport system (2)
- Klassifizierung (2)
- Klimawandel (2)
- Konzentration (chem) (2)
- Layout (2)
- Leaching (2)
- Level of service (2)
- Load (2)
- Mathematical model (2)
- Messung (2)
- Motorcyclist (2)
- Motorradfahrer (2)
- Network (traffic) (2)
- Norm (tech) (2)
- Numerisches Modell (2)
- Permeability (2)
- Pollutant (2)
- Procurement (2)
- Psychological aspects (2)
- Psychologische Gesichtspunkte (2)
- Public transport (2)
- Radfahrer (2)
- Rechenmodell (2)
- Recycling (2)
- Rigid pavement (2)
- Schadstoff (2)
- Simulation (2)
- Specification (standard) (2)
- Straße (2)
- Surfacing (2)
- Temperatur (2)
- Temperature (2)
- Traffic lane (2)
- Tragfähigkeit (2)
- Umweltverträglichkeitsprüfung (2)
- Unfallverhütung (2)
- Vehicle (2)
- Verbundbrücke (2)
- Verhalten (2)
- Verkehrsnetz (2)
- Verkehrsverflechtung (2)
- Verwaltung (2)
- Veränderung (2)
- Wasser (2)
- Water (2)
- Winter maintenance (2)
- Winterdienst (2)
- Wirksamkeitsuntersuchung (2)
- Wirkungsanalyse (2)
- Working group (2)
- Zement (2)
- Zuschlagstoff (2)
- Zustandsbewertung (2)
- Öffentlicher Verkehr (2)
- Ablösung (Bindemittel) (1)
- Absorption (1)
- Abutment (1)
- Accessibility (1)
- Accident black spot (1)
- Accident prevention (1)
- Air pollution (1)
- Air quality management (1)
- Air transport (1)
- Aircraft (1)
- Alkali Zuschlag Reaktion (1)
- Alkali silica reaction (1)
- Aluminat (1)
- Aluminate (1)
- Analyse (math) (1)
- Analysis (math) (1)
- Animal (1)
- Anti locking device (1)
- Antiblockiersystem (1)
- Antrieb (tech) (1)
- Arbeitsbedingungen (1)
- Asphaltstraße (Oberbau) (1)
- Auftauen (1)
- Auftaumittel (1)
- Ausrüstung (1)
- Autonomes Fahren (1)
- Autonomes Fahrzeug (1)
- Autonomous driving (1)
- Autonomous vehicle (1)
- Balken (1)
- Beam (1)
- Behinderter (1)
- Bepflanzung (1)
- Berechnung d Straßenoberbaus (1)
- Betriebshof (1)
- Betriebskosten (1)
- Betriebsverhalten (1)
- Bibliographie (1)
- Bibliography (1)
- Bituminous mixture (1)
- Bituminöses Mischgut (1)
- Blood (1)
- Blut (1)
- Bottleneck (1)
- Braking (1)
- Brand (1)
- Breite (1)
- Bremsung (1)
- Bridge " Composite bridge (1)
- Bridge surfacing (1)
- Bruch (mech) (1)
- Brückenbelag (1)
- Bus (1)
- By product (1)
- Böschung (1)
- Calcium (1)
- Capacity (Road, footway) (1)
- Car park (1)
- Carriageway (1)
- Carriageway marking (1)
- Case study (1)
- Certification (1)
- Chemie (1)
- Chemistry (1)
- Cleaning (1)
- Compaction (1)
- Composite bridge (1)
- Confiscation (driving licence) (1)
- Construction site (1)
- Crash Test (1)
- Curing (concrete) (1)
- Cycle track (1)
- Cycling (1)
- Data processing (1)
- Data security (1)
- Database (1)
- Datenbank (1)
- Datensicherheit (1)
- Deformation (1)
- Deicing (1)
- Demografie (1)
- Demography (1)
- Depot (transp) (1)
- Detection (1)
- Detektion (1)
- Diffusion (1)
- Digitale Bildverarbeitung (1)
- Disabled person (1)
- Drainage (1)
- Dreidimensional (1)
- Driver assistance system (1)
- Driver information (1)
- Driver training (1)
- Driving aptitude (1)
- Driving licence (1)
- Driving test (1)
- Droge (1)
- Drugs (1)
- Durchmesser (1)
- Dynamics (1)
- Dynamik (1)
- EU directive (1)
- EU-Richtlinie (1)
- Ecological engineering (1)
- Economic efficiency (1)
- Eigenschaft (1)
- Einbau (1)
- Empfindlichkeit (1)
- Energieverbrauch (1)
- Energy (1)
- Engpass (1)
- Entwässerung (1)
- Equipment (1)
- Erfahrung (menschl) (1)
- Evaluation (Assessment) (1)
- Experience (human) (1)
- External effect (1)
- Externer Effekt (1)
- Fahrausbildung (1)
- Fahrbahn (1)
- Fahrbahnmarkierung (1)
- Fahrerassistenzsystem (1)
- Fahrerinformation (1)
- Fahrgeschicklichkeit (1)
- Fahrprüfung (1)
- Fahrschule (1)
- Fahrsimulator (1)
- Fahrtauglichkeit (1)
- Fahrzeugflotte (1)
- Failure (1)
- Fallstudie (1)
- Fatality (1)
- Fernsteuerung (1)
- Fernverkehrstraße (1)
- Finite element method (1)
- Fire (1)
- Fleet of vehicles (1)
- Flexible pavement (1)
- Flooding (1)
- Folie (1)
- Frame (1)
- Freeways (1)
- Frontalzusammenstoß (1)
- Fuel (1)
- Fugenfüllung (1)
- Führerschein (1)
- Führerschein Punktesystem (1)
- Führerscheinentzug (1)
- Gelenk (1)
- Geschwindigkeit (1)
- Gesetzgebung (1)
- Glue (1)
- Goods traffic (1)
- Greenhouse gas (1)
- Grenzwert (1)
- Griffigkeit (1)
- Ground water (1)
- Grundwasser (1)
- Güterverkehr (1)
- Head on collision (1)
- Heavy (1)
- Herstellung (1)
- Hinge (1)
- Hospital (1)
- Hydrophob (1)
- Hydrophobic (1)
- Image processing (1)
- Impact test (1)
- Impregnation (1)
- Imprägnierung (1)
- In service behaviour (1)
- Incident management (1)
- Industrierückstand (1)
- Ingenieurbiologie (1)
- Intelligentes Transportsystem (1)
- Intelligentes Verkehrssystem (1)
- Inter urban (1)
- Intercity (1)
- Interview (1)
- Joint sealing (1)
- Junction (1)
- Kalk (1)
- Klebstoff (1)
- Knotenpunkt (1)
- Kraftstoff (1)
- Krankenhaus (1)
- Layer (1)
- Laying (1)
- Legislation (1)
- Length (1)
- Lichtsignal (1)
- Lime (1)
- Limit (1)
- Luftfahrzeug (1)
- Luftreinhaltung (1)
- Lufttransport (1)
- Luftverunreinigung (1)
- Länge (1)
- Magnetism (1)
- Magnetismus (1)
- Main road (1)
- Manufacture (1)
- Maritime transport (1)
- Measurement (1)
- Measurment (1)
- Mechanics (1)
- Mechanik (1)
- Medical examination (1)
- Medizinische Untersuchung (1)
- Mehrspurig ; Straßenentwurf (1)
- Membrane (1)
- Merging (1)
- Merging traffic (1)
- Methode der finiten Elemente (1)
- Methodology (1)
- Minderung (1)
- Mineral (1)
- Minimum (1)
- Mixed design (1)
- Mobility management (1)
- Mobilitätsmanagement (1)
- Motorcycle (1)
- Motorrad (1)
- Multilane (1)
- Nachbehandlung (Beton) (1)
- Nature protection (1)
- Naturschutz (1)
- Nitric acid (1)
- Non destructive testing (1)
- Nutzwertanalyse (1)
- Oberbau (1)
- Oberflächentextur (1)
- Operating costs (1)
- Operational research (1)
- Operations Research (1)
- Orthotrope Platte (1)
- Orthotropic plate (1)
- Overlapping (1)
- Parken (1)
- Parkfläche (1)
- Parking (1)
- Parking place (one veh only) (1)
- Parking pricing (1)
- Parkraumbewirtschaftung (1)
- Parkstand (einzeln) (1)
- Passenger transport (1)
- Pavement (1)
- Pavement Management System (1)
- Pavement design (1)
- Perception (1)
- Personenbeförderung (1)
- Personenschaden (1)
- Point demerit system (1)
- Policy (1)
- Politik (1)
- Postcrash phase (1)
- Pothole (1)
- Probe (1)
- Properties (1)
- Propulsion (1)
- Psychologie (1)
- Psychology (1)
- Public participation (1)
- Quality assurance (1)
- Qualitätssicherung (1)
- Quer (1)
- Radar (1)
- Radfahren (1)
- Radius (1)
- Radweg (1)
- Rahmen (Statik) (1)
- Rail traffic (1)
- Rain (1)
- Rate of compaction (1)
- Recidivist (1)
- Recycling (mater) (1)
- Regen (1)
- Rehabilitation (1)
- Rehabilitation (road user) (1)
- Reinforcement (gen) (1)
- Reinigung (1)
- Remote control (1)
- Research projects (1)
- Road traffic (1)
- Road user (1)
- Robot (1)
- Roboter (1)
- Rolled asphalt (1)
- Rutting (wheel) (1)
- Rückfalltäter (1)
- Salpetersäure (1)
- Sample (mater) (1)
- Schicht (1)
- Schienenverkehr (1)
- Schlagloch (1)
- Schwer (1)
- Schweregrad (Unfall (1)
- Seepage (1)
- Seetransport (1)
- Sensitivity (1)
- Service station (1)
- Severity (accid (1)
- Sickerung (1)
- Signalization (1)
- Simulator (driving) (1)
- Skidding resistance (1)
- Skill (road user) (1)
- Slope (terrain) (1)
- Social factors (1)
- Software (1)
- Soziale Faktoren (1)
- Spaltzugfestigkeitsversuch (1)
- Speciifications (1)
- Speed (1)
- Splitting tensile test (1)
- Spurrinne (1)
- Stability (1)
- Stadt (1)
- Stahlbrücke (1)
- Standfestigkeit (1)
- Statics (1)
- Statik (1)
- Statistics (1)
- Statistik (1)
- Steifigkeit (1)
- Stiffness (1)
- Straßenverkehr (1)
- Straßenverkehrsrecht (1)
- Stress (1)
- Stress (psychol) (1)
- Stripping (binder) (1)
- Störfallmanagement (1)
- Sulfat (1)
- Sulphate (1)
- Surface texture (1)
- Surveillance (1)
- Tankstelle (1)
- Technische Überwachung (allg) (1)
- Technologie (1)
- Technology (1)
- Tension (1)
- Thaw (1)
- Three dimensional (1)
- Tier (1)
- Timbering (1)
- Traffic (1)
- Traffic concentration (1)
- Traffic engineering (1)
- Traffic flow (1)
- Traffic regulations (1)
- Traffic signal (1)
- Transverse (1)
- Treibhausgas (1)
- Tödlicher Unfall (1)
- Unfallschwerpunkt (1)
- United Kingdom (1)
- United Nations (1)
- Urban area (1)
- Value analysis (1)
- Variable message sign (1)
- Vegetation (1)
- Verarbeitbarkeit (1)
- Verbau (1)
- Verdichtung (1)
- Verdichtungsgrad (1)
- Vereinigtes Königreich (1)
- Vereinte Nationen (1)
- Verformung (1)
- Verhütung (1)
- Verkehr (1)
- Verkehrsfluss (1)
- Verkehrsqualität (1)
- Verkehrsqualizät (1)
- Verkehrsstärke (1)
- Verkehrstechnik (1)
- Verkehrsteilnehmer (1)
- Verletzung (1)
- Verletzung) (1)
- Verminderung (1)
- Verstärkung (Brücke) (1)
- Verstärkung (allg) (1)
- Viscosity (1)
- Viskosität (1)
- Wahrnehmung (1)
- Waiting time (1)
- Walzasphalt (1)
- Wartezeit (1)
- Wechselverkehrszeichen (1)
- Widerlager (1)
- Width (1)
- Wirtschaftlichkeit (1)
- Workability (1)
- Working conditions (1)
- Zerstörungsfreie Prüfung (1)
- Zertifizierung (1)
- Zug (mech) (1)
- Zugänglichkeit (1)
- Zusammensetzung (1)
- injury) (1)
- Öffentliche Beteiligung (1)
- Überdeckung (1)
- Überschwemmung (1)
Institut
- Sonstige (69) (entfernen)
The first version of German Highway Capacity Manual was published in 2001. Now, a new version is published in 2015 (HBS 2015). For the new German Highway Capacity Manual, most major chapters are revised and some of them are totally rewritten. The chapter for merge, diverge, and small weaving segments is rewritten in accordance with forthcoming developments in the past 10 years. In this paper, an overview of the chapter in the new German Highway Capacity Manual is presented. Procedures dealing with performance analyses and level of service (LOS) of those segments are introduced both for freeways and rural highways. Differences between the former version and the new version of the chapter in the German Highway Capacity Manual are indicated and discussed. In most of the existing highway capacity manuals, LOS of merge, diverge, and small weaving segments is traditionally defined by speed, volume, or density in critical areas. In that traditional concept several capacity values of different critical areas (merge, diverge, and weaving) as well as upstream and downstream basic segments within the influence areas are evaluated separately. In the new HBS 2015, a new model which considers the total merge, diverge, and weaving segment as an entire object is incorporated. A combined volume-to-capacity ratio (freeways) or a combined density (rural highways) is used for defining the LOS of the total segment. The parameters of the new procedure are functions of the number of lanes of the major road, the number of lanes in the on-ramp or off-ramp, and the predefined geometric design of those segments. The coefficients are calibrated with field data or defined by experts" experiences within a matrix of coefficients. With those procedures, the traffic quality (LOS) can be obtained directly as a function of the volumes or densities on the major road and on the on-ramp or off-ramp respectively. The new procedure has the following advantages: a) a uniform function for all types of merge, diverge, and small weaving segments, b) traffic quality assessment for all critical areas under investigation in one step, and c) the procedure can easily be calibrated. For applications in practice, a set of graphs is provided.
Die Straßenverkehrsinfrastruktur ist durch steigende Belastungen und zunehmende Durchschnittsalter mittlerweile vielfach am Rande der Leistungsfähigkeit angelangt. In Zukunft werden Baumaßnahmen in erheblichem Umfang durchzuführen sein. Damit diese Erhaltungsmaßnahmen technisch und wirtschaftlich optimal durchgeführt werden können, ist es notwendig, frühzeitig und umfassend über den aktuellen Zustand, vor allem der Brücken, informiert zu sein. Hierfür ist es notwendig, den Zustand dieser zu erfassen, neue innovative Techniken zur Unterstützung der Bauwerksprüfung nach DIN 1076 sollen hinsichtlich ihrer Eignung überprüft werden. Unbemannte Fluggeräte bzw. UAS (Unmanned Aerial System) bieten vielfältige Möglichkeiten zur Bilderfassung und können als unterstützendes technisches Hilfsmittel bei der Bauwerksprüfung zum Einsatz kommen. Im Rahmen eines Forschungsprojekts wurden drei Brücken mithilfe von UAS beflogen, wodurch Schäden identifiziert werden konnten. Insbesondere die Möglichkeit zur Befliegung schwer zugänglicher Stellen, Zeitersparnis während einer Prüfung und die automatisierte Schadenserkennung machen diese Technologie für die Brückenprüfung interessant. Durch die gezielte Anwendung der UASâ€Technologie kann eine Reduzierung der Nutzungseinschränkung des Bauwerks verbunden mit einer Qualitätssteigerung der Ergebnisse erreicht werden.
Zerstörungsfreie Prüfverfahren (ZfP) zur Messung der Betondeckung sind seit Jahrzehnten bei der Ermittlung des Istzustands von Bestandsbauwerken und als Werkzeug zur Qualitätssicherung sowohl im Neubau als auch in der Betoninstandsetzung fest etabliert. Um zuverlässige Prüfaussagen zu erhalten, ist es zunächst erforderlich, durch die richtige Anwendung eines geeigneten Verfahrens genaue Messergebnisse zu erzeugen und diese dann richtig zu bewerten, z. B. durch einen statistischen Nachweis der Mindestbetondeckung. Daher konzentriert sich dieser Beitrag zunächst auf die Grundlagen von ZfPBauâ€Verfahren zur präzisen Messung der Betondeckung. Hierbei sind magnetisch induktive Verfahren von radarbasierten Verfahren zu unterscheiden, deren jeweilige Möglichkeiten und Grenzen dargelegt werden. Im zweiten Teil wird die erzielbare Genauigkeit mit unterschiedlichen Geräten nach magnetisch induktivem Messprinzip anhand von systematischen Untersuchungen betrachtet. Dabei wird quantifiziert, mit welchen Abweichungen zu rechnen ist, wenn der Durchmesser nicht genau bekannt ist und dicht benachbarte Stäbe das Messergebnis beeinflussen. Abschließend werden die verminderten Abweichungen quantifiziert, wenn geräteeigene Nachbarstabskorrekturen verwendet werden. Das Ziel dieses Beitrags ist kein "Gerätetest", vielmehr soll am Beispiel verschiedener Geräte auf der Basis unterschiedlicher Messprinzipien gezeigt werden, welche Genauigkeit unter welchen Einflussgrößen bei realen Messungen zu erzielen ist.
Inkrementelle Berechnungsmethode zur Beschreibung der strukturellen Schädigung von Asphaltbeton
(2016)
Es existieren erhebliche Diskrepanzen zwischen labortechnischen, analytischen und Feld-Performance-Untersuchungen bezüglich der Entwicklung verschiedener Zustandsgrößen (Schädigungen) von Asphaltbefestigungen in Abhängigkeit von der Zeit. Es gibt mehrere Gründe, weshalb sich die im Labor ermittelten Funktionen zur Beschreibung der Schadensentwicklung nicht mit den realen Entwicklungen in Übereinstimmung bringen lassen. Gegenwärtige Asphalt-Performance-Modelle können die Eigenschaftsänderungen von Baustoffen und Asphaltschichten in Abhängigkeit von Zeit, Verkehrsbelastung und Klima in der Regel nicht genau beschreiben. Daher kann die Schadensentwicklung von Asphaltbefestigungen mit diesen Modellen nur bedingt prognostiziert werden. Alterungsbedingte Veränderungen der Asphalteigenschaften wurden bislang nicht in die Modellbildung mit einbezogen, sodass bislang keine inkrementellen Methoden zur Berücksichtigung der alterungsbedingten Änderung der Materialkenngrößen existierten. Eine Berechnung der Auswirkungen der Materialveränderung durch Alterung auf die Schädigungsmechanismen erfordert eine Modellierung auf der Basis von Zeitinkrementen. Um solche Zeitinkremente sinnvoll einsetzen zu können, ist die Kenntnis der Änderungen der Asphalteigenschaften in Abhängigkeit von der Zeit erforderlich. Der Beitrag stellt Forschungsergebnisse zur Entwicklung und Validierung einer neuen inkrementellen Methode für mechanische Schädigungsmodelle von Asphaltbefestigungen vor. Diese Methode kann die inkrementellen Veränderungen der mechanischen und Performance-Eigenschaften von Asphalt berücksichtigen und somit die daraus resultierende Reaktion über den Verlauf der Nutzungsdauer beschreiben, was einen wesentlichen Beitrag zur Entwicklung eines neuen rechnerischen Prognoseverfahrens für die Nutzungsdauer von Asphaltbefestigungen darstellt.
Derzeit beruht das Erhaltungsmanagement von Brücken vornehmlich auf turnusmäßigen visuellen Bauwerksprüfungen. Schäden werden häufig erst entdeckt, wenn sie offensichtlich sind - was unwirtschaftlich ist. Schäden und kritische Reaktionen des Bauwerks kündigen sich allerdings oftmals schon im Inneren der Struktur, in nicht einsehbaren Bereichen und durch die tatsächlich vorliegenden, aber oft nicht genau bekannten Einwirkungen auf das Bauwerk an. Bestands- und Neubau-Brücken sollten daher in der Lage sein, bereits frühzeitig und ergänzend zu den Bauwerksprüfungen Auskunft über ihren Zustand und dessen Entwicklung geben zu können. Benötigt werden hierzu flexible und modular anpassbare Systeme zur messtechnischen Unterstützung in und am Bauwerk, differenzierte Bewertungsverfahren und ein entsprechend erweitertes Erhaltungsmanagement. Hinsichtlich einer messtechnischen Instrumentierung am Bauwerk sind zum einen leistungsfähige und dauerhafte Sensorik zur Erfassung von Einwirkungen und Bauteilreaktionen an diesem sowie zum anderen eine intelligente Messdatenverarbeitung zur Plausibilisierung, Fusion, Interpolation und Reduktion von Sensordatenströmen vor Ort erforderlich. Der Beitrag fasst im Rahmen aktueller Forschung untersuchte Ansätze und Realisierungsmöglichkeiten zur Sensordatenanalyse und -überwachung - wie sie insbesondere zur Sicherstellung belastbarer, stark fehlerminimierter Zustandsinformationen erforderlich sind - unter praktischen Gesichtspunkten einer Umsetzung bei der Überwachung von Brückenbauwerken zusammen. Verschiedene Verfahrensansätze werden hinsichtlich Einsatzbereich, Aufwand und Nutzen diskutiert. Die gewonnenen Erkenntnisse sind von allgemeiner Bedeutung und daher auf andere Bereiche des Erhaltungsmanagements von Infrastruktur übertragbar.
Im Dezember 2015 wurde die A1-Änderung zum deutschen Nationalen Anhang von DIN EN 1992-1-1 veröffentlicht. Die Änderungen betreffen u. a. den Ansatz der wirksamen Betonzugfestigkeit bei der Ermittlung der Mindestbewehrung zur Begrenzung der Rissbreiten bei frühem Zwang. Der nachfolgende Beitrag erläutert die Hintergründe, warum eine entsprechende A1-Änderung zu DIN EN 1992-2/NA nicht erfolgt. Als Begründung für diese unterschiedliche Vorgehensweise werden die wesentlichen Unterschiede zwischen dem Hochbau und dem Brückenbau dargestellt.
Ab einer Konzentration des Cannabiswirkstoffes Tetrahydrocannabinol (THC) von 1,0 ng/ml im Blutserum kann das Vorliegen verkehrsmedizinisch relevanter Leistungsdefizite nicht ausgeschlossen werden; daher gilt ab diesem Wert der objektive Tatbestand des -§ 24a (2) StVG als erfüllt. In Abhängigkeit von der Konsumfrequenz kann es aber sein, dass eine derartige Konzentration auf einen Konsum zurückgeht, der mehr als 24 Stunden vor der Fahrt stattgefunden hat. Da in diesem Fall sicher keine relevante Cannabiswirkung mehr vorliegt, sind THC-Konzentrationen, die nur wenig oberhalb von 1,0 ng/ml im Blutserum liegen, nicht als Beweis für eine mangelnde Trennung von Konsum und Fahren anzusehen, und ein Direktentzug der Fahrerlaubnis erscheint nicht ohne Weiteres gerechtfertigt. Die Grenzwertkommission hat vorgeschlagen, erst ab einer Blutserumkonzentration an THC von 3,0 ng/ml regelmäßig davon auszugehen, dass Konsum und Fahren nicht ausreichend getrennt wurden, was die Nichteignung zum Führen von Kraftfahrzeugen bedingt. Bei THC-Konzentrationen zwischen 1,0 und 3,0 ng/ml sollte die Fahreignung durch eine medizinisch-psychologische Untersuchung überprüft werden.
Steigende Beanspruchungen insbesondere durch Schwerlastverkehr und altersbedingte Tragfähigkeitsdefizite älterer Brückenbauwerke führen dazu, dass zahlreiche Betonbrücken instand gesetzt oder verstärkt werden müssen. Um einen Beitrag zur konstruktiv und wirtschaftlich erfolgreichen Durchführung zukünftiger Verstärkungsmaßnahmen zu leisten, wurde im Auftrag der Bundesanstalt für Straßenwesen (BASt) eine Erfahrungssammlung zu "Verstärkungen älterer Beton†und Spannbetonbrücken" erstellt. In der Dokumentation wird ein Überblick über den Stand der Technik der im Massivbrückenbau eingesetzten Verstärkungstechniken gegeben, und insgesamt 76 durchgeführte Verstärkungsmaßnahmen werden ausgewertet. Repräsentative Verstärkungsmaßnahmen werden in anonymisierter Form detailliert vorgestellt. Der vorliegende Bericht gibt einen Überblick über die in Kürze erscheinende Erfahrungssammlung, wobei die wesentlichen Erfahrungen der ausgewerteten Anwendungsfälle vorgestellt werden.
Anteile und zeitliche Verteilung von Oberflächenabfluss, Infiltration und Durchsickerung von Böschungen aus teilgesättigten Erddämmen infolge von Niederschlägen und Straßenabfluss sind bisher nur unzureichend bekannt. Für Straßenbauingenieure reicht das vorhandene Wissen über Wasser im Straßen-Erdbauwerk zur Beurteilung der Gebrauchstauglichkeit aus. Für die hydrologische Beurteilung der Durchsickerung im Hinblick auf den Boden- und Grundwasserschutz ist der heutige Wissensstand jedoch nicht ausreichend. Ziel des Projektes ist es, einen dringend benötigten Beitrag zur wirtschaftlichen und umweltverträglichen Verwertung von Ersatzbaustoffen im Erdbau zu leisten und bisher fehlende Beurteilungsmaßstäbe für den Boden- und Grundwasserschutz für die straßenbauspezifischen Gegebenheiten zu liefern. Zur Erreichung des Forschungsziels wurden in der Lysimeteranlage in Augsburg, Derchinger Straße, in acht Becken Böschungen eingebaut, die jeweils einen Ausschnitt aus einer Straßenböschung einschließlich eines Bankettstreifens darstellen. Zur Simulation von belastetem Bodenmaterial wurden dem Böschungsmaterial Schadstoffe zu dotiert. Zusätzlich wurden technische Sicherungsmaßnahmen eingebaut. Ergänzend zu den hydraulischen Größen Niederschlag, Menge von Sickerwasser und Oberflächenabfluss der Lysimeter wurden auch Konzentrationen der zu dotierten Schadstoffe (Cadmium, Kupfer und Cyanid} und weitere Parameter im Sickerwasser der Lysimeter und im Straßenabfluss bestimmt. Das dargestellte Projekt wurde gemeinsam durch die Hochschule Augsburg und die BASt von 2010 bis 2013 durchgeführt. Ein Anschlussprojekt ist derzeit in Bearbeitung.
Umweltgerechte Entwicklung von Verkehr und Infrastruktur - ein verkehrsträgerübergreifender Ansatz
(2016)
Im Expertennetzwerk des Bundesministeriums für Verkehr und digitale Infrastruktur (BMVI) sind seit 2016 die wissenschaftlichen Fachbehörden und Forschungseinrichtungen der Bundesregierung für den Straßenverkehr, die Binnen- und Seeschifffahrt, den Eisenbahnverkehr, die Luftfahrt und der Deutsche Wetterdienst zusammengeschlossen, um gemeinsam an der Entwicklung sicherer und umweltgerechter Verkehrssysteme zu arbeiten. Für die Zusammenarbeit wurden drei große Bereiche definiert, darunter das Themenfeld "Verkehr und Infrastruktur umweltgerecht gestalten". Hier werden zwischen 2016 und 2019 fünf Forschungsprojekte bearbeitet. Sie sind den Themen (1) Lebensraumvernetzung, (2) Biodiversität und Neobiota, (3) Verkehrslärm sowie (4/5) verkehrs- und infrastrukturbedingte stoffliche Umweltbelastungen gewidmet. Der Beitrag umreisst die mittel- und langfristigen Ziele des Expertennetzwerks im Bereich "Infrastruktur/Umwelt" und die Inhalte und Ziele der fünf Projekte der ersten Etappe der Zusammenarbeit.