Filtern
Erscheinungsjahr
Dokumenttyp
Volltext vorhanden
- nein (24) (entfernen)
Schlagworte
- Bridge (19)
- Brücke (19)
- Brücken Management System (10)
- Unterhaltung (9)
- Bridge management system (8)
- Maintenance (8)
- Spannbeton (8)
- Bewertung (7)
- Cost (7)
- Kosten (7)
Institut
- Abteilung Brücken- und Ingenieurbau (23)
- Sonstige (7)
- Zentralabteilung (1)
The case study "Digital Test Area Autobahn" is presented. A new built (September 2016) pre-stressed concrete bridge is equipped with different monitoring systems for the detection of traffic load, climatic influence and the reaction of the bridge. Possibilities for the implementation of a VoI (Value of Information) analyses are presented.