Filtern
Erscheinungsjahr
Dokumenttyp
Schlagworte
- Bridge (25)
- Brücke (25)
- Unterhaltung (14)
- Bauwerk (13)
- Maintenance (13)
- Brücken Management System (12)
- Engineering structure (12)
- Bridge management system (11)
- Planning (11)
- Planung (11)
Institut
- Abteilung Brücken- und Ingenieurbau (32)
- Sonstige (7)
- Zentralabteilung (1)
In future, additional and more detailed data are needed about the current conditions of bridges for preventive maintenance management. Monitoring procedures are not merely able to provide key performance indicators for a specific point in time, but also over a period. These KPIs must be selected in such a way as to permit substantiated statements about the present and future condition of bridges. For this reason, greater efforts must be made to define the significant KPIs for the various types of bridges, and show how these figures can be reliably determined. Both the COST Action TU1402, and TU1406 offer important approaches which, properly combined, can deliver substantial added value to the calculation and description of the condition of bridges in the interest of proactive maintenance management.
Aufgrund der Altersstruktur des Brückenbestands und der zunehmenden Verkehrsbelastung besteht die dringende Notwendigkeit viele ältere Brücken im Bundesfernstraßennetz zukunftsfähig zu ertüchtigen. Im Rahmen der Ressortforschung des BMVI und der BASt werden die wesentlichen Aspekte analysiert und erforderliche Verfahren entwickelt. Dies betrifft eine netzweite Risikoanalyse hinsichtlich des Erfordernisses von objektbezogenen Betrachtungen, die Weiterentwicklung der Nachrechnungsformate und Entscheidungshilfen zur Unterstützung der Straßenbauverwaltungen im Hinblick auf die Ertüchtigung des Bestands.
Das geplante umfassende Bauwerks-Management-System (BMS) beinhaltet alle Funktionen zur Durchführung des Erhaltungsmanagements. Grundlage ist die Erhebung und Bereitstellung von objektbezogenen Informationen. In Verbindung mit netzbezogenen Daten, Rahmenbedingungen und Restriktionen wird damit die Basis für Analyseprozesse bereitgestellt. Als Ergebnisse werden unter anderem Maßnahmenvorschläge, optimierte Programmplanungen und Angaben zum Finanzbedarf entwickelt. Ein wichtiger Gesichtspunkt ist, dass einheitliche und kompatible Verfahren für alle beteiligten Verwaltungen bereitgestellt werden. Die Konzeption des BMS umfasst sieben Teilmodule, die in einer Reihe von Forschungs- und Entwicklungsvorhaben realisiert werden. Der derzeitige Schwerpunkt besteht in der Entwicklung von Schädigungsmodellen, Maßnahmen- und Kostenkatalogen sowie von Analyseverfahren. Im Beitrag werden die einzelnen Realisierungsstufen erläutert sowie ein Überblick über die aktuellen Forschungsprojekte und geplanten Aktivitäten gegeben.
Die Beurteilung der Nachhaltigkeit von Bauwerken gewinnt in jüngerer Vergangenheit zunehmend an Bedeutung. Während für den üblichen Hochbau bereits nationale und internationale Beurteilungsverfahren existieren, fehlen diese bisher für Ingenieurbauwerke und verkehrliche Anlagen. Die Publikation befasst sich mit einem Vorschlag für ein praxisnahes Bewertungsverfahren für derartige Bauwerke, beschreibt die zu Grunde liegende Methodik und zeigt die maßgebenden Gesichtspunkte für eine ganzheitliche Nachhaltigkeitsbewertung auf.
Die Bundesanstalt fuer Straßenwesen wurde vom Bundesministerium fuer Verkehr mit der Konzeption eines Managementsystems der Erhaltungsplanung fuer Brücken- und Ingenieurbauwerke des deutschen Fernstraßennetzes beauftragt. Dabei sollte ein System konzipiert werden, welches zum einen den Bund in die Lage versetzt, neben einem Überblick über den aktuellen Zustand der Bauwerke auf Netzebene auch Aussagen zum Finanzbedarf zu erlangen und Strategien, langfristige Ziele sowie Rahmenbedingungen in der Erhaltungspraxis zu verwirklichen. Zum anderen sollten Ländern und Behörden Empfehlungen zur Durchführung von Verbesserungen auf Objektebene geliefert werden, die mit den Strategien, langfristigen Zielen, Rahmenbedingungen und Haushaltszwängen vereinbar sind. In einem ersten Schritt wurden bestehende Bauwerks-Managementsysteme analysiert sowie aktuelle Entwicklungstendenzen aufgezeigt. Das aktuelle Vorgehen von Bund und Ländern bei der Erhaltungsplanung wurde im Rahmen einer Länderbefragung im Detail bestimmt. Dabei wurden auch die Zielvorstellungen der Betreiber eines zukünftigen Managementsystems der Bauwerkserhaltung identifiziert. Aufbauend auf diesen Erkenntnissen sowie einer bereits entwickelten Grobkonzeption des BMS wurden die Strukturen des Managementsystems erarbeitet, einzelne Module festgelegt und die Abläufe der Erhaltungsplanung unter Berücksichtigung von Randbedingungen und Zielkriterien erarbeitet. Ein wesentliches Ergebnis neben der Konzeption ist die Erarbeitung eines Stufenplans mit Zeitachse für die Entwicklung des Managementsystems sowie die Formulierung von Teilprojekten zur Fertigstellung des Systems mit Zeitplan. Aufbauend auf diesen Planungen ist die Realisierung eines kompletten BMS für Bund und Länder bis zum Jahr 2005 möglich. Stufe 0: Ausgangsbasis, Grundlagen für einen Verteilungsschlüssel für Finanzmittel des Bundes, sofort möglich. - Stufe 1: Grundlage für netzweite Bewertungen und Analysen auf Länder- und Bundesebene, ab 2000 - Stufe 2: Grundlage für die Dringlichkeitsreihung und die Bewertung von Maßnahmevarianten, ab 2001 - Stufe 3: Grundlage für die Bedarfsermittlung und die Finanzplanung, ab 2003 - Stufe 4: Programmplanung mit Restriktionen, Verknüpfung von Managementsystemen, ab 2005. Voraussetzung ist jedoch die Bereitstellung ausreichender Finanzmittel beim BMVBW oder der BASt sowie die Bereitstellung aller erforderlicher Daten (ASB, Teilsystem Bauwerksdaten, Verkehrsdaten, Unfalldaten, Netzdaten usw.) durch die Länder. Hierbei wäre die Unterstützung des Bundes hilfreich.
The Federal Highway Network of Germany represents considerable fixed assets. Construction and maintenance activities not only require a high budget, but also influence the traffic infrastructure and, thus, the economy and society as a whole. The present safety of the network has to be ensured under consideration of environmental aspects. At the same time the network owner has to make sure that the civil works are carried out in the most efficient way. Considering the fact that financial resources are restricted, the costs have to be spent in a way to obtain the greatest possible benefit. This task is supported by the application of a comprehensive Asset Management, which is subdivided into operational and controlling tasks respectively. The paper describes the current management procedures.
Germany's road infrastructure grew over centuries to become the arteries and lifelines of our society. The present safety of the infrastructure has to be ensured under consideration of environmental aspects. At the same time the owner has to make sure that the maintenance activities are carried out in the most efficient way. Considering the fact that financial resources are restricted, maintenance costs have to be spent in a way to obtain the greatest possible benefit. In the case of bridges, which are one of the most important parts of the road infrastructure in Germany, this task is supported by the application of a bridge management system (BMS). The existing German BMS contains assessment and optimization procedures on object and network level and is the basis for advancements to meet future demands. Developments concern life cycle and quality-oriented, holistically optimized procedures. Reasonable infrastructure management will contribute to meeting efficiency and sustainability objectives and to achieving interoperability. Here holistic network infrastructure management methods are required. There is a strong need for management solutions during the whole service life of a structure. The definition of criteria for evaluation of the relevance of failure mechanisms, including acceptance thresholds, requires the availability of relevant data for management procedure. Tools for innovative investigation methods and an effective data management will help in meeting the requirements. Relevant fields of research are improved maintenance strategies to meet future demands concerning heavy goods traffic, application and further development of nondestructive testing methods for efficient and sustainable management structures, and the improvement of analytic management tools to meet future demands.
Brückenmanagement
(2001)
Die systematische Erhaltung der Brücken im Zuge der Bundesfernstraßen ist eine wichtige Aufgabe für den Baulastträger Bund und die Straßenbauverwaltungen der Länder. Um künftig Erhaltungsprogramme auf einer einheitlichen Grundlage unter Berücksichtigung gesamtwirtschaftlicher Grundsätze aufstellen zu können, wird durch die Bundesanstalt für Straßenwesen derzeit im Auftrag des Bundesministeriums für Verkehr, Bau- und Wohnungswesen ein umfassendes Bauwerks-Management-System (BMS) konzipiert und realisiert. Das geplante BMS beinhaltet alle Funktionen zur Durchführung des Erhaltungsmanagements. Grundlage ist die Erhebung und Bereitstellung von objektbezogenen Informationen. In Verbindung mit netzbezogenen Daten, Rahmenbedingungen und Restriktionen wird damit die Basis für Analyseprozesse, zum Beispiel Wirtschaftlichkeitsuntersuchungen, Priorisierungen und Bedarfsermittlungen bereitgestellt. Als Ergebnis werden Maßnahmenvorschläge, optimierte Programmplanungen und Angaben zum Finanzbedarf entwickelt. Verfahren und Programmsysteme werden schrittweise ab 2002 bis 2005 den Straßenbauverwaltungen zur Verfügung gestellt.
The first stage of the work has been to collate information on bridge assessment from the participating countries. In the later stages, the aim is to provide guidelines that reflect the current best practices, a methodology that will allow for future development and sufficient flexibility to accommodate variations in national priorities as the process of harmonisation is pursued. The following tasks fall within the scope of the project: (1) a review of current procedures and standards used for bridge assessment in Europe; (2) the development of models for taking into account the bridge specific traffic conditions and material properties; (3) the use of reliability methods based on a probabilistic approach for bridge assessment including the use of measurements for updating the reliability of structural elements; and (4) the provision of recommendations for methods and procedures that can be adopted for the assessment module of the management framework highlighting where further development will be beneficial.
The Federal Ministry of Transport, Building and Housing is aiming for a comprehensive Management System taking into account state-specific and federal requirements as well as existing regulations in the frame of maintenance planning. The system is subdivided into three processes, each comprising special tools for valuation, analysing and planning. Some of the sub-modules have already been realised, eg the database at state level, the inspection procedure in combination with the procedures of damage and condition assessment and the estimation of future maintenance costs at federal level. Other sub-modules are currently being prepared, eg tools for evaluation and selection of measures. However, a large portion of the essential issues are still in the planning phase, eg program creation by taking restrictions into account. The realisation of the complete Management System will be finished by the year 2005.