Filtern
Erscheinungsjahr
- 2014 (2) (entfernen)
Dokumenttyp
Sprache
- Englisch (2) (entfernen)
Schlagworte
- Germany (2) (entfernen)
Institut
- Abteilung Brücken- und Ingenieurbau (2) (entfernen)
This document describes the development and state of the art of orthotropic steel bridges in Germany. Following a short historical review of the performance of orthotropic bridge decks over the last decades, the present traffic loads are described and related to the resistance of the existing structures. Based on four different hazard categories, this paper describes different retrofitting methods. Although several promising strengthening techniques are introduced and evaluated, it appears that further research is urgently required in order to improve these techniques.
In Germany road tunnels on major roads which are longer than 400 m have to be monitored permanently. For that purpose the tunnels are equipped with a multitude of monitoring and detection systems whose data and messages are transmitted to tunnel control centres. Due to the higher traffic density, the increasing number of tunnels to be monitored and road users" demand of higher safety and security levels, the strains on operating staff of tunnel control centres have continuously been growing. Therefore, innovative approaches have been developed in two recent German research projects: RETISS " Real Time Security Management System, and ESIMAS " Real-time Safety Management System for road Tunnels. Both systems are designed to allow faster and more efficient reaction of tunnel operators in order to maintain the capacity and availability of transport infrastructures but also to improve the safety and security of road users.