Filtern
Erscheinungsjahr
- 2016 (100) (entfernen)
Dokumenttyp
- Buch (Monographie) (48)
- Wissenschaftlicher Artikel (25)
- Konferenzveröffentlichung (17)
- Teil eines Buches (Kapitel) (5)
- Bericht (5)
Schlagworte
- Deutschland (54)
- Germany (53)
- Forschungsbericht (48)
- Research report (47)
- Bewertung (25)
- Evaluation (assessment) (23)
- Test (17)
- Versuch (17)
- Brücke (14)
- Safety (14)
- Sicherheit (14)
- Bridge (13)
- Prüfverfahren (13)
- Richtlinien (13)
- Test method (13)
- Specifications (12)
- Verfahren (11)
- Boden (10)
- Method (10)
- Nachhaltige Entwicklung (10)
- Soil (10)
- Sustainability (10)
- Autobahn (9)
- Lebenszyklus (9)
- Life cycle (9)
- Transport infrastructure (9)
- Verbesserung (9)
- Verkehrsinfrastruktur (9)
- Improvement (8)
- Beton (7)
- Concrete (7)
- Planning (7)
- Planung (7)
- Reinforcement (in mater) (7)
- Baustoff (6)
- Bauwerk (6)
- Bemessung (6)
- Bewehrung (6)
- Conference (6)
- Design (overall design) (6)
- Engineering structure (6)
- Konferenz (6)
- Material (constr) (6)
- Perception (6)
- Recycling (6)
- Reinforced concrete (6)
- Stahlbeton (6)
- Statistik (6)
- Tunnel (6)
- Wahrnehmung (6)
- Behaviour (5)
- Bindemittel (5)
- Binder (5)
- CEN (5)
- Development (5)
- Driver (5)
- Earthworks (5)
- Ecobalance (5)
- Entwicklung (5)
- Erdarbeiten (5)
- Fahrer (5)
- Forecast (5)
- Forschungsarbeit (5)
- Impact study (5)
- Instandsetzung (5)
- Modification (5)
- Motorway (5)
- Prognose (5)
- Quality (5)
- Qualität (5)
- Recycling (mater) (5)
- Repair (5)
- Road construction (5)
- Road network (5)
- Straßenbau (5)
- Straßennetz (5)
- Umwelt (5)
- Verhalten (5)
- Wasser (5)
- Water (5)
- Ökobilanz (5)
- Accident (4)
- Apparatus (measuring) (4)
- Asphaltoberbau (4)
- Bau (4)
- Berechnung (4)
- Calculation (4)
- Construction (4)
- Dauerhaftigkeit (4)
- Decision process (4)
- Durability (4)
- Emission (4)
- Entscheidungsprozess (4)
- Environment (4)
- Ermüdung (mater) (4)
- Fahrzeugführung (4)
- Fatigue (mater) (4)
- Festigkeit (4)
- Full depth asphalt pavement (4)
- Gesetzgebung (4)
- Highway (4)
- Highway design (4)
- Kapazität (Straße) (4)
- Landstraße (4)
- Legislation (4)
- Messgerät (4)
- Messung (4)
- Prestressed concrete (4)
- Research project (4)
- Rural road (4)
- Seepage (4)
- Sickerung (4)
- Spannbeton (4)
- Statics (4)
- Statistics (4)
- Straße (4)
- Straßenentwurf (4)
- Strength (mater) (4)
- Traffic control (4)
- Unfall (4)
- Verkehrssteuerung (4)
- Weather (4)
- Witterung (4)
- Arbeitsgruppe (3)
- Auftrag (3)
- Bearing capacity (3)
- Belastung (3)
- Bitumen (3)
- Bituminous mixture (3)
- Bituminöses Mischgut (3)
- Capacity (road, footway) (3)
- Contract (3)
- Cost (3)
- Cost benefit analysis (3)
- Cracking (3)
- Cycling (3)
- Cyclist (3)
- Damage (3)
- Driving (veh) (3)
- Driving aptitude (3)
- Durchlässigkeit (3)
- Efficiency (3)
- Fahrleistung (3)
- Fahrsimulator (3)
- Fahrtauglichkeit (3)
- Fatality (3)
- Freeway (3)
- Fuge (3)
- Ground water (3)
- Information (3)
- Information documentation (3)
- Injury (3)
- Intelligent transport system (3)
- Joint (structural) (3)
- Junction (3)
- Knotenpunkt (3)
- Kosten (3)
- Laboratorium (3)
- Laboratory (not an organization) (3)
- Leistungsfähigkeit (allg) (3)
- Load (3)
- Main road (3)
- Maintenance (3)
- Mathematical model (3)
- Measurement (3)
- Metal bridge (3)
- Metallbrücke (3)
- Norm (tech) (3)
- Permeability (3)
- Pollutant (3)
- Prevention (3)
- Psychological aspects (3)
- Psychologische Gesichtspunkte (3)
- Radfahren (3)
- Radfahrer (3)
- Rechenmodell (3)
- Risikobewertung (3)
- Risk assessment (3)
- Rissbildung (3)
- Sachschaden (3)
- Schadstoff (3)
- Sensor (3)
- Simulation (3)
- Simulator (driving) (3)
- Specification (standard) (3)
- Telematics (3)
- Telematik (3)
- Tragfähigkeit (3)
- Tödlicher Unfall (3)
- Unterhaltung (3)
- Vehicle mile (3)
- Verkehrsstärke (3)
- Veränderung (3)
- Wirksamkeitsuntersuchung (3)
- Wirtschaftlichkeitsrechnung (3)
- Working group (3)
- Accident rate (2)
- Adhesion (2)
- Adhäsion (2)
- Administration (2)
- Aggregate (2)
- Annual average daily traffic (2)
- Anpassung (allg) (2)
- Asphaltstraße (Oberbau) (2)
- Auftaumittel (2)
- Auslaugung (2)
- Ausschreibung (2)
- Automatisch (2)
- Baustelle (2)
- Beschilderung (2)
- Betonstraße (Oberbau) (2)
- Betriebshof (2)
- Bicycle (2)
- Bildschirm (2)
- By product (2)
- Böschung (2)
- Camera (2)
- Cement (2)
- Classification (2)
- Climate change (2)
- Concentration (chem.) (2)
- Condition survey (2)
- Cycle track (2)
- Datenbank (2)
- Datenverarbeitung (2)
- Decke (Straße) (2)
- Decrease (2)
- Deformation (2)
- Deicing (2)
- Depot (transp) (2)
- Digital model (2)
- Drainage (2)
- Droge (2)
- Drunkenness (2)
- Dynamics (2)
- Dynamik (2)
- Electric vehicle (2)
- Elektrofahrzeug (2)
- Entwässerung (2)
- Ergonomics (2)
- Ergonomie (2)
- Fahrrad (2)
- Fahrstreifen (2)
- Fahrzeug (2)
- Fernverkehrstraße (2)
- Financing (2)
- Finanzierung (2)
- Flexible pavement (2)
- Geologie (2)
- Geschwindigkeit (2)
- Gestaltung (2)
- Grundwasser (2)
- Impact study (environment) (2)
- Improvements (2)
- Industrierückstand (2)
- Intelligentes Transportsystem (2)
- JDTV (2)
- Jahr (2)
- Kamera (2)
- Klassifizierung (2)
- Klimawandel (2)
- Konzentration (chem) (2)
- Layout (2)
- Leaching (2)
- Level of service (2)
- Mechanics (2)
- Mechanik (2)
- Medical examination (2)
- Medizinische Untersuchung (2)
- Motorcycle (2)
- Motorcyclist (2)
- Motorrad (2)
- Motorradfahrer (2)
- Network (traffic) (2)
- Non destructive testing (2)
- Numerisches Modell (2)
- Oberbau (2)
- Parken (2)
- Parking (2)
- Pavement (2)
- Pavement Management System (2)
- Personenschaden (2)
- Procurement (2)
- Public transport (2)
- Quality assurance (2)
- Qualitätssicherung (2)
- Radweg (2)
- Reaction (human) (2)
- Reaktionsverhalten (2)
- Rear view mirror (2)
- Rigid pavement (2)
- Rückspiegel (2)
- Service area (2)
- Service station (2)
- Slope (terrain) (2)
- Speed (2)
- Stadt (2)
- Statik (2)
- Steifigkeit (2)
- Stiffness (2)
- Straßenverkehr (2)
- Straßenverkehrsrecht (2)
- Surfacing (2)
- Tank Rast Anlage (2)
- Tankstelle (2)
- Temperatur (2)
- Temperature (2)
- Traffic (2)
- Traffic concentration (2)
- Traffic count (2)
- Traffic lane (2)
- Traffic regulations (2)
- Umweltverträglichkeitsprüfung (2)
- Unfallhäufigkeit (2)
- Unfallverhütung (2)
- Urban area (2)
- Vehicle (2)
- Verbundbrücke (2)
- Verformung (2)
- Verkehr (2)
- Verkehrserhebung (2)
- Verkehrsnetz (2)
- Verkehrsverflechtung (2)
- Verwaltung (2)
- Viskosität (2)
- Visual display (2)
- Wechselverkehrszeichen (2)
- Winter maintenance (2)
- Winterdienst (2)
- Wirkungsanalyse (2)
- Year (2)
- Zement (2)
- Zerstörungsfreie Prüfung (2)
- Zuschlagstoff (2)
- Zustandsbewertung (2)
- Öffentlicher Verkehr (2)
- Abfluss (1)
- Ablenkung (1)
- Ablösung (Bindemittel) (1)
- Absorption (1)
- Abutment (1)
- Accessibility (1)
- Accident black spot (1)
- Accident prevention (1)
- Age (1)
- Air pollution (1)
- Air quality management (1)
- Air transport (1)
- Aircraft (1)
- Alkali Zuschlag Reaktion (1)
- Alkali silica reaction (1)
- Alter (1)
- Alternativ (1)
- Alternative (1)
- Aluminat (1)
- Aluminate (1)
- Analyse (math) (1)
- Analysis (math) (1)
- Animal (1)
- Anschlussstelle (1)
- Anti locking device (1)
- Antiblockiersystem (1)
- Antrieb (tech) (1)
- Arbeitsbedingungen (1)
- Arterial highway (1)
- Attitude (psychol) (1)
- Auftauen (1)
- Ausfahrt (1)
- Ausrüstung (1)
- Automatic (1)
- Automation (1)
- Autonomes Fahren (1)
- Autonomes Fahrzeug (1)
- Autonomous driving (1)
- Autonomous vehicle (1)
- Balken (1)
- Bauweise (1)
- Beam (1)
- Behinderter (1)
- Bepflanzung (1)
- Berechnung d Straßenoberbaus (1)
- Betriebskosten (1)
- Betriebsverhalten (1)
- Bibliographie (1)
- Bibliography (1)
- Blood (1)
- Blood alcohol content (1)
- Blut (1)
- Blutalkoholgehalt (1)
- Bodenmechanik (1)
- Bottleneck (1)
- Braking (1)
- Brand (1)
- Breite (1)
- Bremsung (1)
- Bridge " Composite bridge (1)
- Bridge surfacing (1)
- Bruch (mech) (1)
- Brückenbelag (1)
- Bus (1)
- Calcium (1)
- Capacity (Road, footway) (1)
- Car park (1)
- Carriageway (1)
- Carriageway marking (1)
- Case study (1)
- Cause (1)
- Certification (1)
- Chemie (1)
- Chemistry (1)
- Cleaning (1)
- Compaction (1)
- Composite bridge (1)
- Compression (1)
- Confiscation (driving licence) (1)
- Construction method (1)
- Construction site (1)
- Crash Test (1)
- Curing (concrete) (1)
- Data bank (1)
- Data processing (1)
- Data security (1)
- Database (1)
- Datensicherheit (1)
- Deflectograph (1)
- Demografie (1)
- Demography (1)
- Detection (1)
- Detektion (1)
- Diffusion (1)
- Digitale Bildverarbeitung (1)
- Disabled person (1)
- Dissertation (1)
- Disstraction (1)
- Dreidimensional (1)
- Driver (veh) (1)
- Driver assistance system (1)
- Driver information (1)
- Driver training (1)
- Driving licence (1)
- Driving test (1)
- Drug (1)
- Drugs (1)
- Durchbiegungsmesser (1)
- Durchmesser (1)
- EU directive (1)
- EU-Richtlinie (1)
- Ecological engineering (1)
- Economic efficiency (1)
- Eigenschaft (1)
- Einbau (1)
- Einfahrt (1)
- Einstellung (psychol) (1)
- Elektronische Deichsel (1)
- Empfindlichkeit (1)
- Energieverbrauch (1)
- Energy (1)
- Enforcement (law) (1)
- Engpass (1)
- Entrance (1)
- Enviroment (1)
- Equipment (1)
- Erfahrung (menschl) (1)
- Error (1)
- Europa (1)
- Europe (1)
- Evaluation (Assessment) (1)
- Exit (1)
- Experience (human) (1)
- Expert opinion (1)
- External effect (1)
- Externer Effekt (1)
- Fahrausbildung (1)
- Fahrbahn (1)
- Fahrbahnmarkierung (1)
- Fahrerassistenzsystem (1)
- Fahrerinformation (1)
- Fahrgeschicklichkeit (1)
- Fahrprüfung (1)
- Fahrschule (1)
- Fahrzeugabstand (1)
- Fahrzeugflotte (1)
- Fahrzeugteil (Sicherheit) (1)
- Failure (1)
- Fallstudie (1)
- Fehler (1)
- Fernsteuerung (1)
- Fernverkehrsstraße (1)
- Finite element method (1)
- Fire (1)
- Fleet of vehicles (1)
- Flooding (1)
- Folie (1)
- Frame (1)
- Freeways (1)
- Frontalzusammenstoß (1)
- Fuel (1)
- Fugenfüllung (1)
- Full scale (1)
- Führerschein (1)
- Führerschein Punktesystem (1)
- Führerscheinentzug (1)
- Gelenk (1)
- Georadar (1)
- Gesetzesdurchführung (1)
- Glue (1)
- Goods traffic (1)
- Greenhouse gas (1)
- Grenzwert (1)
- Griffigkeit (1)
- Ground penetrating radar (1)
- Gutachten (1)
- Güterverkehr (1)
- Head on collision (1)
- Heavy (1)
- Heavy metal (1)
- Herstellung (1)
- Highway traffic (1)
- Higway design (1)
- Hinge (1)
- Hospital (1)
- Human factor (1)
- Hydrophob (1)
- Hydrophobic (1)
- Illness (1)
- Image processing (1)
- Impact test (1)
- Impregnation (1)
- Imprägnierung (1)
- In service behaviour (1)
- Incident management (1)
- Ingenieurbiologie (1)
- Intelligentes Verkehrssystem (1)
- Inter urban (1)
- Interchange (1)
- Intercity (1)
- Interview (1)
- Inventar (1)
- Inventory (1)
- Joint sealing (1)
- Kalk (1)
- Klebstoff (1)
- Kraftstoff (1)
- Krankenhaus (1)
- Krankheit (1)
- LKW (1)
- Layer (1)
- Laying (1)
- Length (1)
- Lichtsignal (1)
- Lime (1)
- Limit (1)
- Lorry (1)
- Luftfahrzeug (1)
- Luftreinhaltung (1)
- Lufttransport (1)
- Luftverunreinigung (1)
- Länge (1)
- Magnetism (1)
- Magnetismus (1)
- Man (1)
- Mann (1)
- Manufacture (1)
- Maritime transport (1)
- Measurment (1)
- Mehrspurig ; Straßenentwurf (1)
- Membrane (1)
- Menschlicher Faktor (1)
- Merging (1)
- Merging traffic (1)
- Methode der finiten Elemente (1)
- Methodology (1)
- Minderung (1)
- Mineral (1)
- Minimum (1)
- Mixed design (1)
- Mobility management (1)
- Mobilitätsmanagement (1)
- Multilane (1)
- Nachbehandlung (Beton) (1)
- Nachhaltiger Transport (1)
- Nature protection (1)
- Naturschutz (1)
- Nicht motorisiert (1)
- Nitric acid (1)
- Non motorized (1)
- Normalgröße (1)
- Nutzwertanalyse (1)
- Oberflächentextur (1)
- Operating costs (1)
- Operational research (1)
- Operations Research (1)
- Organisation (1)
- Organization (association) (1)
- Orthotrope Platte (1)
- Orthotropic plate (1)
- Overlapping (1)
- Parkfläche (1)
- Parking place (one veh only) (1)
- Parking pricing (1)
- Parkraumbewirtschaftung (1)
- Parkstand (einzeln) (1)
- Passenger transport (1)
- Pavement design (1)
- Pavement management system (1)
- Personenbeförderung (1)
- Platooning (electronic) (1)
- Point demerit system (1)
- Police (1)
- Policy (1)
- Politik (1)
- Polizei (1)
- Pollution (1)
- Postcrash phase (1)
- Pothole (1)
- Probe (1)
- Properties (1)
- Propulsion (1)
- Pschologische Untersuchung (1)
- Psychological examination (1)
- Psychologie (1)
- Psychology (1)
- Public participation (1)
- Publicity (1)
- Quer (1)
- Quick (1)
- Radar (1)
- Radius (1)
- Rahmen (Statik) (1)
- Rail traffic (1)
- Rain (1)
- Rate of compaction (1)
- Recidivist (1)
- Regen (1)
- Rehabilitation (1)
- Rehabilitation (road user) (1)
- Reinforcement (gen) (1)
- Reinigung (1)
- Remote control (1)
- Repetitive loading (1)
- Research projects (1)
- Road traffic (1)
- Road user (1)
- Roadside (1)
- Robot (1)
- Roboter (1)
- Rolled asphalt (1)
- Run off (1)
- Rutting (wheel) (1)
- Rückfalltäter (1)
- Salpetersäure (1)
- Sample (mater) (1)
- Sanitary facilities (1)
- Sanitäre Anlagen (1)
- Schicht (1)
- Schienenverkehr (1)
- Schlagloch (1)
- Schnell (1)
- Schwer (1)
- Schweregrad (Unfall (1)
- Schwermetall (1)
- Seetransport (1)
- Sensitivity (1)
- Severity (accid (1)
- Signalization (1)
- Skidding resistance (1)
- Skill (road user) (1)
- Social factors (1)
- Software (1)
- Soil mechanics (1)
- Soziale Faktoren (1)
- Spaltzugfestigkeitsversuch (1)
- Speciifications (1)
- Splitting tensile test (1)
- Spurrinne (1)
- Stability (1)
- Stahlbrücke (1)
- Standfestigkeit (1)
- Straßenseitenfläche (1)
- Stress (1)
- Stress (psychol) (1)
- Stripping (binder) (1)
- Störfallmanagement (1)
- Sulfat (1)
- Sulphate (1)
- Surface texture (1)
- Surveillance (1)
- Sustainable transport (1)
- Technische Überwachung (allg) (1)
- Technologie (1)
- Technology (1)
- Temperature measurement (1)
- Temperaturmessung (1)
- Tension (1)
- Thaw (1)
- Thesis (1)
- Three dimensional (1)
- Tier (1)
- Timbering (1)
- Traffic density (1)
- Traffic engineering (1)
- Traffic flow (1)
- Traffic signal (1)
- Transverse (1)
- Treibhausgas (1)
- Trunkenheit (1)
- Trunkheit (1)
- Unfallschwerpunkt (1)
- United Kingdom (1)
- United Nations (1)
- Ursache (1)
- Value analysis (1)
- Variable message sign (1)
- Variable message signs (1)
- Vegetation (1)
- Vehicle safety device (1)
- Vehicle spacing (1)
- Verarbeitbarkeit (1)
- Verbau (1)
- Verdichtung (1)
- Verdichtungsgrad (1)
- Vereinigtes Königreich (1)
- Vereinte Nationen (1)
- Verhütung (1)
- Verkehrsfluss (1)
- Verkehrsqualität (1)
- Verkehrsqualizät (1)
- Verkehrstechnik (1)
- Verkehrsteilnehmer (1)
- Verletzung (1)
- Verletzung) (1)
- Verminderung (1)
- Verschmutzung (1)
- Verstärkung (Brücke) (1)
- Verstärkung (allg) (1)
- Viscosity (1)
- Viskosity (1)
- Waiting time (1)
- Walzasphalt (1)
- Wartezeit (1)
- Werbung (1)
- Widerlager (1)
- Width (1)
- Wiederholte Belastung (1)
- Wirtschaftlichkeit (1)
- Workability (1)
- Working conditions (1)
- Zertifizierung (1)
- Zug (mech) (1)
- Zugänglichkeit (1)
- Zusammendrückung (1)
- Zusammensetzung (1)
- injury) (1)
- Öffentliche Beteiligung (1)
- Überdeckung (1)
- Überschwemmung (1)
This study aimed to better understand nitrate transport in the soil system in a part of the state of North Rhine-Westphalia, in Germany, and to aid in the development of groundwater protection plans. An advection-diffusion (AD) cell was used in a miscible displacement experiment setup to characterize nitrate transport in 12 different soil samples from the study area. The three nitrate sorption isotherms were tested to define the exact nitrate interaction with the soil matrix. Soils varied in their properties which in its turn explain the variations in nitrate transport rates. Soil texture and organic matter content showed to have the most important effect on nitrate recovery and retardation. The miscible displacement experiment indicated a decrease in retardation by increasing sand fraction, and an increase in retardation by increasing soil organic matter content. Soil samples with high sand fractions (up to 94 %) exhibited low nitrate sorption capacity of less than 10 %, while soils with high organic matter content showed higher sorption of about 30 %. Based on parameterization for nitrate transport equation, the pore water velocity for both sandy and loamy soils were significantly different (P < 0.001). Pore water velocity in sandy soil (about 4 x 10 high 3 m/s) was about 100 to 1000 larger than in loamy soils (8.7 x 10 high 5 m/s). On the other hand, the reduction in nitrate transport in soils associated with high organic matter was due to fine pore pathways clogged by fine organic colloids. It is expected that the existing micro-phobicity increased the nitrate recovery from 9 to 32 % resulting in maximum diffusion rates of about 3.5 x 10 high 5 m/s2 in sandy soils (sample number CS-04) and about 1.4 x 10 high 7 m/s2 in silt loam soils (sample number FS-02).
Im vorliegenden Forschungsvorhaben wird zunächst das aus dem Jahre 2010 stammende Bewertungssystem für Brückenbauwerke (FE 15.494/2010/FRB) überarbeitet. Der erforderliche Anpassungsbedarf wird dabei hauptsächlich aus der bereits durchgeführten Pilotstudie (FE 15.0522/2011/FRB) ermittelt. Zudem finden auch Erkenntnisse aus weiteren Forschungsprojekten der BASt Berücksichtigung. Diese sind z.B. "Konzeptionelle Ansätze zur Nachhaltigkeitsbewertung im Lebenszyklus von Elementen der Straßeninfrastruktur" (FE 09.0162/2011/LRB), "Einheitliche Bewertungskriterien für Elemente der Straßenverkehrsinfrastruktur im Hinblick auf Nachhaltigkeit " Straße und Tunnel" (FE 09.0164/2011/LRB) und "Grundlagen für einen Leitfaden "Nachhaltige Straßeninfrastrukturen" " Anforderungen an Baustoffe, Bauwerke und Realisierungsprozesse der Straßeninfrastrukturen im Hinblick auf Nachhaltigkeit" (FE 09.0179/2011/MRB). Im zweiten Teil des Vorhabens wird mit der Entwicklung eines Pre-Check Systems ein neuer Systembaustein zur Komplettierung des Bewertungssystems für Brücken erarbeitet. Mit Abschluss des vorliegenden Projekts steht damit ein Systempaket für die Bewertung von Brücken in verschiedenen Leistungsphasen nach HOAI zur Verfügung. Nun kann sowohl eine Pre-Check Bewertung in der Leistungsphase 2 durchgeführt werden, als auch ein fertiggestelltes Bauwerk am Ende der Leistungsphase 8 bewertet werden. Die Pre-Check Bewertung kann zukünftig zur Entscheidungsfindung für die Festlegung einer Vorzugsvariante dienen. Nach Fertigstellung der Brücke kann dann die Pre-Check Bewertung mit der Bewertung des fertiggestellten Bauwerks verglichen werden. Hierbei ist besonders die Prognosequalität des Pre-Checks im Hinblick auf das endgültige Bewertungsergebnis für das fertiggestellte Bauwerk interessant. Durch die klare Trennung der Bewertung des Ist-Zustands (fertiggestelltes Bauwerk) von der Prognose der Nachhaltigkeitsqualität im Rahmen des Pre-Check, gewinnt die Bewertung an Transparenz.
Seit Jahresbeginn 2013 dürfen Fernbuslinien in Deutschland untereinander und mit dem Eisenbahnverkehr konkurrieren. Um dabei allen Passagiergruppen im Sinne der Inklusion gerecht zu werden, müssen Fernlinienbusse ab 2020 (bei erstmaliger Zulassung schon ab 2016) mit zwei Rollstuhlstellplätzen ausgestattet sein, einen ungehinderten Zugang durch entsprechende Freiräume vorhalten und Einstiegshilfen für Rollstuhlnutzer anbieten. Wie eine barrierefreie Ausstattung von Fernlinienbussen im Detail gestaltet wird, ist jedoch bisher noch nicht verbindlich geregelt. Ziel des Projektes Barrierefreiheit bei Fernlinienbussen war es, Empfehlungen zu erarbeiten, die die Gesetzgebung für eine europaweit einheitliche Regelung zur Barrierefreiheit bei Fernlinienbussen unterstützen. Hierfür wurden Bedingungen für und Anforderungen an Barrierefreiheit für unterschiedliche Fahrgastgruppen mit beeinträchtigter Mobilität untersucht. In Verbindung mit einer Recherche zu aktuellen Definitionen von Barrierefreiheit, Normen und Richtlinien für barrierefreie Gestaltung von Transportmitteln sowie deren angelagerte Infrastruktur wurde eine Definition von Barrierefreiheit bei Fernlinienbussen abgeleitet. Unter schrittweisem Einbezug von Ist-Erhebungen für Fahrzeugausstattung und Infrastruktur sowie internationalen Best-Practice-Beispielen wurden Maßnahmenpakete für die Fahrzeugausstattung, den Betrieb und die Infrastruktur formuliert, die Barrierefreiheit bei einer Fernlinienbusreise für verschiedene Fahrgastgruppen gewährleisten sollen. Die Maßnahmenpakete wurden einer kritischen Betrachtung der praktischen Umsetzbarkeit und daraus entstehender Kosten unterzogen. Die Kernergebnisse des Projektes, die Definition und die Maßnahmenpakete für Barrierefreiheit bei Fernlinienbussen unterstützen die Diskussion über die Ausstattung von Fernlinienbussen sowie über die Verwirklichung einer barrierefreien Reisekette.
Das Forschungsvorhaben prüft die Straßenverkehrs-Emissionsmodelle COPERT und TREMOD hinsichtlich ihrer Eignung für die Verwendung bzw. Verwendbarkeit für verschiedene Aspekte der Emissionsberechnung. Verschiedene Querbeziehungen bestehen zwischen den beiden Ansätzen beider Modelle. So nutzen beide die im Rahmen von HBEFA bzw. ERMES entwickelten Grundlagen für die Bestimmung der betriebswarmen Emissionen. TREMOD verwendet denselben Verkehrssituationen-basierten Ansatz wie HBEFA, während COPERT Funktionen zur Berechnung der Emissionsfaktoren aus der Durchschnittsgeschwindigkeit aus den HBEFA-Grundlagendaten herleitet. Bei den Verdampfungsemissionen kommt bei beiden Modellen der für COPERT entwickelte Ansatz zum Einsatz, während für die Ermittlung der Kaltstartzuschläge beide Modelle eigene Vorgehensweisen implementiert haben. Für die Berücksichtigung der Entwicklung der Kraftstoffverbrauchswerte unterscheiden sich die Methoden ebenfalls. Zwischen beiden Modellen bestehen signifikante Unterschiede, sowohl betreffend Eingangsdaten wie auch Emissionsresultaten. Bei Verwendung der originalen Aktivitätsdaten bewegen sich die Abweichungen des gesamten Verbrauchs pro Jahr bei +/-5% und die Abweichungen der gesamten Emissionen pro Schadstoff und Jahr bei -1% bis 45% (bei positiver Abweichung liegt COPERT höher). Bei Verwendung der gleichen Aktivitätsdaten liegen die Abweichungen des Verbrauchs pro Jahr bei -2% bis +14% und die Abweichungen der Emissionen bei -4% bis 25%. Die größten Unterscheide bestehen bei den Kaltstart- und Verdampfungsemissionsfaktoren. Im Eignungsvergleich werden in vielen Punkten beide Modelle als ähnlich gut geeignet beurteilt. Insgesamt wird TREMOD bei einer Mehrheit der Indikatoren in der Kriteriengruppe "Nutzen" als geeigneter beurteilt. Bei den "Kosten" und "weiteren Kriterien" erhält COPERT in einer Mehrheit der Indikatoren die bessere Beurteilung. Die Wahl des geeigneten Modells ist jedoch u.a. von der Fragestellung und dem Anwendungsfall abhängig.
Das Emissionsberechnungsmodell TREMOD (Transport Emission Model) bildet den motorisierten Straßen-, Schienen-, Schiffs- und Flugverkehr in Deutschland hinsichtlich seiner Verkehrs- und Fahrleistungen, dem Energieverbrauch und den zugehörigen Luftschadstoffemissionen für den Zeitraum 1960 bis 2030 ab. TREMOD ist eng verknüpft mit dem als PC-Datenbank realisierten "Handbuch Emissionsfaktoren für den Straßenverkehr", das europaweit abgestimmte repräsentative Emissionsdaten für den Straßenverkehr bereitstellt. Im Rahmen des vorliegenden Vorhabens wurden aus heutiger Sicht relevante alternative Antriebe und Energieträger für den Straßenverkehr in das Emissionsrechenmodell "TREMOD" implementiert. Dies soll es ermöglichen, Szenarien bis 2050 zu rechnen, um die Auswirkung der Einführung neuer Fahrzeugkonzepte auf den Energieverbrauch, die Klimagasemissionen und relevante Luftschadstoffemissionen abschätzen zu können. Im vorliegenden Bericht werden die Eigenschaften der ausgewählten neuen Kraftstoffe und Antriebe, die verwendeten Kennzahlen sowie die Implementierung in das TREMOD-Modell ausführlich beschrieben. Schließlich wird beispielhaft ein Trendszenario unter Berücksichtigung von neuen Antrieben und Energieträgern bis 2050 entworfen und mit TREMOD berechnet.
Non-point sources of traffic-related pollution become a major concern as they " compared to the point-source inputs " are more difficult to be defined or controlled. It is crucial to evaluate the fraction of traffic-related contamination that is transported to the road surroundings as it could negatively impact soil, surface water and groundwater. This study describes two means through which pollutants leave the road to the surrounding environment. Three German motorways were selected (A4, A555, and A61), where runoff and deposits were analyzed to determine pollutant load moving into the roadside soil or into the drainage system. Each of the three motorways carries approximately 70,000 vehicles a day on 4 to 6 driving lanes; and they cover a broad range of truck participation in the total traffic load ranging from 5.4% to 19.8%. The three motorways represent several topographical and landscape features as forest with noise barrier and parallel as well as perpendicular orientation to the main wind direction. Sampling of runoff and deposition was done on monthly basis. Bulk deposition was collected in Bergerhoff vessels at two heights (1.5 m and 0.3 m above the ground) and in 1 m, 2.5 m, 5 m and 10 m distances from the road edge. The results showed that heavy metals as well as large amounts of mineral compounds are moving from the driving lanes into the roadside environment. This includes sodium from applying deicing salts in winter seasons, which could be found in soil, dust and water samples. Calcium and iron were also detected in almost comparable concentrations. The annual deposition flow (bulk deposition) measured at a height of 1.5 m was higher than the comparative values for urban areas and background measuring points. The spatial distribution of material deposition showed clear differences between the three motorways. The pollutant load in deposition measured near the ground surface was higher than those measured at 1.5 m above the land surface. At all three sites, a clear negative correlation between pollutant load and the distance from the roadside could be found. Nearly 90% of the concentration values of heavy metals in road runoff were below or in the range of the test values for seepage water in the German Soil Protection and Contamination Ordinance. The pH-values around 7 in runoff and adjacent soil provide a good retention capacity in the soil for the heavy metal input.
Established in 1997, the European New Car Assessment Programme (Euro NCAP) provides consumers with a safety performance assessment for the majority of the most popular cars in Europe. Thanks to its rigorous crash tests, Euro NCAP has rapidly become an important driver safety improvement to new cars. After ten years of rating vehicles, Euro NCAP felt that a change was necessary to stay in tune with rapidly emerging driver assistance and crash avoidance systems and to respond to shifting priorities in road safety. A new overall rating system was introduced that combines the most important aspects of vehicle safety under a single star rating. The overall rating system has allowed Euro NCAP to continue to push for better fitment and higher performance for vehicles sold on the European market. In the coming years, the safety rating is expected to play an important role in the support of the roll-out of highly automated vehicles.
Im Rahmen des Forschungsprojektes Cyber-Safe fand am 10. März 2016 bei der Bundesanstalt für Straßenwesen (BASt) in Bergisch Gladbach ein Workshop zum Thema "Steigerung der IT-Sicherheit von Verkehrs- und Tunnelleitzentralen" statt. An diesem Workshop beteiligten sich 40 Experten der Verkehrs- und Tunnelüberwachung. Die Tätigkeitsfelder der Teilnehmer reichten von Tunneloperatoren über Tunnelmanager und IT-Fachleute bis hin zu Sicherheitsbeauftragten.
Zerstörungsfreie Prüfverfahren (ZfP) zur Messung der Betondeckung sind seit Jahrzehnten bei der Ermittlung des Istzustands von Bestandsbauwerken und als Werkzeug zur Qualitätssicherung sowohl im Neubau als auch in der Betoninstandsetzung fest etabliert. Um zuverlässige Prüfaussagen zu erhalten, ist es zunächst erforderlich, durch die richtige Anwendung eines geeigneten Verfahrens genaue Messergebnisse zu erzeugen und diese dann richtig zu bewerten, z. B. durch einen statistischen Nachweis der Mindestbetondeckung. Daher konzentriert sich dieser Beitrag zunächst auf die Grundlagen von ZfPBauâ€Verfahren zur präzisen Messung der Betondeckung. Hierbei sind magnetisch induktive Verfahren von radarbasierten Verfahren zu unterscheiden, deren jeweilige Möglichkeiten und Grenzen dargelegt werden. Im zweiten Teil wird die erzielbare Genauigkeit mit unterschiedlichen Geräten nach magnetisch induktivem Messprinzip anhand von systematischen Untersuchungen betrachtet. Dabei wird quantifiziert, mit welchen Abweichungen zu rechnen ist, wenn der Durchmesser nicht genau bekannt ist und dicht benachbarte Stäbe das Messergebnis beeinflussen. Abschließend werden die verminderten Abweichungen quantifiziert, wenn geräteeigene Nachbarstabskorrekturen verwendet werden. Das Ziel dieses Beitrags ist kein "Gerätetest", vielmehr soll am Beispiel verschiedener Geräte auf der Basis unterschiedlicher Messprinzipien gezeigt werden, welche Genauigkeit unter welchen Einflussgrößen bei realen Messungen zu erzielen ist.
Die Straßenverkehrsinfrastruktur ist durch steigende Belastungen und zunehmende Durchschnittsalter mittlerweile vielfach am Rande der Leistungsfähigkeit angelangt. In Zukunft werden Baumaßnahmen in erheblichem Umfang durchzuführen sein. Damit diese Erhaltungsmaßnahmen technisch und wirtschaftlich optimal durchgeführt werden können, ist es notwendig, frühzeitig und umfassend über den aktuellen Zustand, vor allem der Brücken, informiert zu sein. Hierfür ist es notwendig, den Zustand dieser zu erfassen, neue innovative Techniken zur Unterstützung der Bauwerksprüfung nach DIN 1076 sollen hinsichtlich ihrer Eignung überprüft werden. Unbemannte Fluggeräte bzw. UAS (Unmanned Aerial System) bieten vielfältige Möglichkeiten zur Bilderfassung und können als unterstützendes technisches Hilfsmittel bei der Bauwerksprüfung zum Einsatz kommen. Im Rahmen eines Forschungsprojekts wurden drei Brücken mithilfe von UAS beflogen, wodurch Schäden identifiziert werden konnten. Insbesondere die Möglichkeit zur Befliegung schwer zugänglicher Stellen, Zeitersparnis während einer Prüfung und die automatisierte Schadenserkennung machen diese Technologie für die Brückenprüfung interessant. Durch die gezielte Anwendung der UASâ€Technologie kann eine Reduzierung der Nutzungseinschränkung des Bauwerks verbunden mit einer Qualitätssteigerung der Ergebnisse erreicht werden.