Filtern
Erscheinungsjahr
- 2004 (2) (entfernen)
Sprache
- Englisch (2) (entfernen)
Schlagworte
- Bauweise (1)
- Bearing capacity (1)
- Beton (1)
- Betonstraße (Oberbau) (1)
- Boden (1)
- Clay (1)
- Concrete (1)
- Construction method (1)
- Earthworks (1)
- Erdarbeiten (1)
Institut
- Abteilung Straßenbautechnik (2)
- Sonstige (1)
As investigations by BASt have shown, a bond between concrete surfaces and bases may be a disadvantage when water penetrates via joints and from the sides if the bond becomes partially detached at an early stage. Free water may penetrate into the area between the concrete surface and the base and build up in areas where the bond is still intact. The high pressure caused by lorry wheels rolling over the pavement causes hydrodynamic pumping. This creates very high flow speeds with considerable corrosion power. This results in the base course surface being eroded in the areas where heavy vehicles drive over the road and may even lead to water and fine particles from the base courses being expelled through the longitudinal joints between the pavement slab and the lower hard shoulder or first overtaking lane. The erosion of the base leads unavoidably to the bearing conditions deteriorating and increased loading of the concrete surface. Cracks may occur and, later stepping-off and tilting of the plates components. This significantly deteriorates the evenness and consequently the service value of the road. This finally leads to a reduction in the service life of the concrete surface. To avoid such damage water which has penetrated must be able to lose pressure and to then seep away. A possible solution is: A nonwoven fabric substance between concrete suface and bound base course. This construction method has proved himselve on numerous test road sections and were rightly included in the new Codes of Practice for the Standardisation of the Upper Structure of Traffic-Bearing Surfaces (Richtlinien für die Standardisierung des Oberbaues von Verkehrsflächen- RStO).
Federal highway A 26 in Germany : reinforced dams in soft soils - control method according DIN 1054
(2004)
In 2001 the construction of the Federal Highway A 26 in Lower Saxony (north of Germany) was started. In this area the underground is without any substantial bearing capacity as it consists of soft layers ( clay, peat) with a thickness of up to 12 m. Because it was not possible to exchange the soil neither completely nor partially pre-loading procedure (consolidation method) was chosen for this construction. Short- and long-term stability are ensured by the use of high-tensile fabrics for reinforcement at the dam basis. The vertical and horizontal deformations and the stress changes in the soil, caused by the pre-load procedure, has to be controlled by special geotechnical measurements. Additionally, in the higher parts of the dam the strain behaviour of the high-tensile fabrics is measured. These measurements form the basis for the application of the control method according DIN 1054. In this article, the special circumstances of this project are described. Further on the geotechnical measurements, the winning and evaluation of the necessary parameters of the subsoil, and the consequences of these data for the ongoing of the project are laid down. Intermediate results of the geotechnical measurements are described.