Filtern
Erscheinungsjahr
Dokumenttyp
Volltext vorhanden
- nein (18) (entfernen)
Schlagworte
- Tunnel (16)
- Richtlinien (6)
- Specifications (6)
- Abdichtung (5)
- Lebenszyklus (5)
- Life cycle (5)
- Safety (5)
- Sicherheit (5)
- Waterproofing (5)
- Bemessung (4)
- Fire (4)
- Prüfverfahren (4)
- Research project (4)
- Risikobewertung (4)
- Risk assessment (4)
- Transport infrastructure (4)
- Bau (3)
- Bewertung (3)
- Construction (3)
- Cross section (3)
- Dauerhaftigkeit (3)
- Deutschland (3)
- Durability (3)
- Europa (3)
- Europe (3)
- Evacuation (3)
- Evakuierung (3)
- Evaluation (assessment) (3)
- Feuer (3)
- Forschungsarbeit (3)
- Geomembran (3)
- Geomembrane (3)
- Germany (3)
- Prevention (3)
- Querschnitt (3)
- Test method (3)
- Tunnel lining (3)
- Tunnelauskleidung (3)
- Verhütung (3)
- Verkehrsinfrastruktur (3)
- Ageing (2)
- Alterung (mater) (2)
- Bearing capacity (2)
- Bridge (2)
- Brücke (2)
- Costs (2)
- Design (2)
- Design (overall design) (2)
- Economic efficiency (2)
- Faserbewehrter Beton (2)
- Gefahrenabwehr (2)
- Kosten (2)
- PVC (2)
- Polyvinylchloride (2)
- Quality assurance (2)
- Qualitätssicherung (2)
- Security (2)
- Simulation (2)
- Temperatur (2)
- Temperature (2)
- Tragfähigkeit (2)
- Wasser (2)
- Water (2)
- Wirtschaftlichkeit (2)
- Bauwerk (1)
- Belastung (1)
- Beton (1)
- Bodenmechanik (1)
- Brand (1)
- Chemical analysis (1)
- Chemische Analyse (1)
- Climate change (1)
- Concrete (1)
- Critical path method (1)
- Curve (math) (1)
- Digital model (1)
- Drainage (1)
- EU (1)
- Eigenschaft (1)
- Engineering structure (1)
- Entwässerung (1)
- Festigkeit (1)
- Fiber reinforced concrete (1)
- Fibre reinforced concrete (1)
- Flooding (1)
- Fugenfüllung (1)
- Functional safety (1)
- Funktionale Sicherheit (1)
- Herstellung (1)
- In situ (1)
- Incident management (1)
- Klimawandel (1)
- Kunststoff (1)
- Kurve (math) (1)
- Langfristig (1)
- Lebensdauer (1)
- Load (1)
- Long term (1)
- Maintenance (1)
- Manufacture (1)
- Method (1)
- Mobility (1)
- Mobilität (1)
- Modification (1)
- Netzplantechnik (1)
- Norm (tech) (1)
- Numerisches Modell (1)
- Oxidation (1)
- Planning (1)
- Planung (1)
- Plastic material (1)
- Polymer (1)
- Polyolefin (1)
- Polyvinylhydrocarbon (1)
- Properties (1)
- Rain (1)
- Regen (1)
- Reinforcement (1)
- Resilience (1)
- Resilienz (1)
- Road network (1)
- Sealing compound (1)
- Service life (1)
- Soil mechanics (1)
- Specification (standard) (1)
- Straßennetz (1)
- Strength (mater) (1)
- Störfallmanagement (1)
- Terrorism (1)
- Terrorismus (1)
- Test (1)
- Test procedure (1)
- Time (1)
- Unterhaltung (1)
- Verarbeitbarkeit (1)
- Verfahren ; Verkehrsinfrastruktur (1)
- Verstärkung (1)
- Versuch (1)
- Veränderung (1)
- Workability (1)
- Zeit (1)
- Überschwemmung (1)
Institut
- Abteilung Brücken- und Ingenieurbau (18)
- Sonstige (10)
Infolge der gestiegenen Sicherheitsanforderungen für Straßentunnel und des daraus folgenden umfangreichen sicherheitstechnischen Nachrüstungsprogramms werden im Straßentunnelbau häufiger Rettungsstollen realisiert. Die Ausführung von Rettungsstollen wurde bisher projektspezifisch festgelegt. Mit Aufnahme der Anforderungen an Rettungsstollen in das technische Regelwerk wird die einschalige Spritzbetonbauweise als Regelbauweise festgelegt, sofern die hydrogeologischen Bedingungen dies zulassen. Durch den Einsatz von wasserundurchlässigen Spritzbeton - gegebenenfalls unter Zugabe von Stahlfasern - kann die Dichtigkeitsklasse 3 nach der ZTV-ING sicher erreicht werden. Die Läenge eines begehbaren Rettungsstollens mit einem lichten Querschnitt von 2,25 m x 2,25 m ist auf 3000 m begrenzt. Bei längeren Rettungsstollen ist ein befahrbarer Querschnitt von 3,50 m x 3,50 m vorzusehen.
Fire incidents are among the most relevant for people in a tunnel. Therefore, it is important to be sufficiently prepared for such events. A large scale fire test is to be used to help evaluate the initial burning duration and the time it takes for the fire to spread to other vehicles in the tunnel, and in particular how long it takes for a truck carrying wooden pallets to catch fire, taking into consideration the extremely high temperatures. The goal, therefore, is to determine the time it takes for a fire to spread to other vehicles in the tunnel. In the large scale fire test, an accident in a tunnel with one-way traffic is simulated between a truck loaded with approximately 3.7 t of wooden Europol pallets and a passenger car. Directly behind each of the vehicles involved in the accident there is another car which stops at a distance of 1.0 m. Approximately 300 litres of burning diesel are discharged from the truck's fuel tank, which is simulated by using approximately 400 litres of isopropanol. A 10 m-² burning pool forms underneath the truck. Other objectives of the large scale fire test are the validation of the CFD models and the evaluation of the progression of the thermal release ratios estimated for the simulation. The thermal release ratios generated in the test are determined and evaluated using various models.
Risk-based approach for the protection of land transport infrastructure against extreme rainfall
(2016)
The aim of the research project "Risk based approach for the protection of transport infrastructure against extreme rainfall RAINEX" is the development of a practical methodology for the identification and assessment of both vulnerable as well as critical transport infrastructures towards extreme rainfall events consequences. The developed methodology is based on expert knowledge and includes qualitative and semi-quantitative analyses regarding the assessment of the vulnerability and criticality of relevant transport infrastructures. The process chain from the spatial rainfall to the concentrated runoff in the river channel was shown to assess the local hazard resulting in the local risk. The main result of the project is a practice-oriented and applicable methodology and a comprehensive and well-developed security handbook.
Tunnel in Spritzbetonbauweise werden in der Regel mit einem Dichtungssystem aus Kunststoffdichtungsbahnen (KDB) gegen das anstehende Bergwasser abgedichtet. Tunnelabdichtungen aus KDB müssen dabei über die gesamte Nutzungsdauer des Bauwerks zuverlässig ihre Funktion erfüllen. Zur Verifizierung und Kalibrierung von Prüfverfahren zur Langzeitbeständigkeit von KDB können u. a. in situ gealterte KDB-Proben aus bestehenden Straßentunneln sehr nützlich sein. Die Ergebnisse umfangreicher Untersuchungen zu den Materialeigenschaften von KDB-Proben aus insgesamt acht älteren Straßentunneln zeigen, dass einige mechanische Eigenschaften der KDB auf eine bereits stattgefundene Alterung der KDB hindeuten, aber überwiegend noch die Anforderungen der Regelwerke eingehalten werden. Die Ergebnisse der Untersuchungen bestätigen die bereits in der Vergangenheit vorgenommenen Änderungen im Regelwerk und sind auch bei der aktuellen Fortschreibung der Zusätzlichen Technischen Vertragsbedingungen und Richtlinien für Ingenieurbauten (ZTV-ING) eingeflossen.
Efficient and widely available transport infrastructure is one of the most important prerequisites for sustainable economic development to meet the demand for mobility. In this context, being able to manage traffic growth forecasts is of particular importance. In Germany, current forecasts indicate a 40% increase in rail and road transport in the country. However, about 60% of bridges (as measured by bridge area) on the national German highway system that are suitable for freight transport were built before 1985. In other transport sectors as well, aging infrastructure is one of the key challenges for the availability and the resilience of European transport infrastructure. Many bridges in the national German highway system are already at their load-bearing limit. Furthermore, required maintenance measures have not been adequately carried out in the past due to limited budgets, leading to overall bridge deterioration. Further challenges for owners and operators of transport infrastructure result from the effects of climate change, associated climate extremes, natural catastrophes, and possible criminal and terrorist threats. To ensure that future infrastructure challenges can be successfully addressed, strategies and solutions must be developed and implemented in a timely manner to enable holistic and sustainable life-cycle management. The concepts of Resilience Management as well as Resilience Engineering are essential building blocks in this process. Resilience is the ability to survive in the face of a complex, uncertain, and ever-changing future. It is a way of thinking about both short-term cycles and long-term trends. Using this concept, owners and operators can reduce the risk of disruption in the face of shocks and stresses. Resilience requires cyclical, proactive, and holistic risk management practices.
The field of safety in road tunnels has always been an important issue for operators, owners and the responsible authorities. After the tunnel accidents in 1999 the subject gained however in importance. On European level the Directive 2004/54 EC on "Minimum safety requirements for tunnels in the Trans European Road network" has been published. This guideline has to be implemented into national law by all Member States. According to the guideline all Member States of the European Community shall develop a methodology for risk analyses to be applied in certain cases. For Germany, a standardized methodology for a probabilistic quantitative risk assessment has been worked out.
Infolge der seit 2003 in den RABT formulierten schärferen Sicherheitsanforderungen ist für Gegenverkehrstunnel bei Neuplanungen und bautechnischen Nachrüstungen häufig die Anordnung eines parallel zur Hauptröhre verlaufenden Rettungsstollens erforderlich. Untersuchungen der Bundesanstalt für Straßenwesen (BASt) zur Wirtschaftlichkeit verschiedener aktueller und auch neuer Querschnittsvarianten haben gezeigt, dass insbesondere ein Querschnitt mit integriertem begehbarem Rettungsweg unter bestimmten Voraussetzungen Kostenvorteile gegenüber der Regellösung mit parallelem Rettungsstollen bietet. In ergänzenden Untersuchungen wurden konstruktive und sicherheitstechnische Detailfragen für einen Querschnitt RQ 10,5 T mit integriertem Rettungsweg untersucht und bewertet. Ein Kostenvergleich mit der Regellösung mit parallelem Rettungsstollen wurde durchgeführt.
A very high service availability is important for the operator and for the user of road tunnels, too. The service availability of a structure is directly related to its quality. The earlier quality assurance measures are being considered during the life cycle, the better a structure of high quality can be guaranteed. Problems which occur during the operation period of a structure often result from design errors or from inadequate realisation during the construction phase. They may also occur as a result of wrongly planned maintenance and refurbishment works. Thus, the transfer of specific data, information and experiences through the whole life cycle is very important. In this context methods of facility management can provide efficient assistance when they have already been used throughout all three classic phases of a structure's life cycle - planning, construction and operation. Finally the tunnel drainage system of German road tunnels is considered as an example as practical application possibility.
Im Rahmen eines von der Bundesanstalt für Straßenwesen (BASt) initiierten Forschungsvorhabens (15.449/2007/ERB: "Prüfverfahren zur Beurteilung der Lebensdauer von Kunststoffdichtungsbahnen für Straßentunnel") wurden anhand von Untersuchungen an Kunststoffdichtungsbahnen (KDB) auf Basis von Polyolefinwerkstoffen die Möglichkeiten der Beurteilung der oxidativen Langzeitbeständigkeit sondiert. Im Mittelpunkt stand die Erprobung des Autoklaventests in Anlehnung an DIN EN ISO 13438 (Methode C1/C2) an ausgewählten, für den Tunnelbau repräsentativen marktüblichen KDB-Produkten. Die Untersuchungen im Autoklaven bei erhöhten Temperaturen (60 -°C, 70 -°C und 80 -°C) und Sauerstoffdrücken (11, 21 und 51 bar) wurden durch vergleichende Versuche im Wärmeschrank (Ofen) bei erhöhter Temperatur (85 -°C) in Anlehnung an DIN EN 14575 ergänzt. Die KDB-Produkte wurden außerdem einer eingehenden Materialcharakterisierung (Zugprüfung, OMA, DSC) unterzogen. Weiterhin wurden Bauwerksdaten recherchiert und auf ihre Nutzbarkeit zur Bewertung und Prüfbarkeit der Langzeitbeständigkeit von KDB in Tunneln betrachtet. Ziel war auch, die Anwendbarkeit des bisher vorgeschlagenen Extrapolationsmodells zur Auswertung der Ergebnisse von Autoklaventests an im Tunnelbau marktüblichen Produkten für Nutzungsdauern über 25 Jahre zu überprüfen und zur Entwicklung eines geeigneten Prüfverfahrens beizutragen. Der Beitrag geht auf Ergebnisse des Vorhabens ein und zeigt erste Schlussfolgerungen und weiteren Untersuchungsbedarf auf. Die Ergebnisse werden in den "Empfehlungen zu Dichtungssystemen im Tunnelbau EAG-EDT" des Arbeitskreises 5.1 "Kunststoffe in der Geotechnik und im Wasserbau" berücksichtigt, deren 2. Auflage in Vorbereitung ist. Aspekte des thermischen Verhaltens der eingesetzten Werkstoffe sowie mögliche Anpassungen der Prüfrandbedingungen für die Autoklaventests werden ergänzt und Hinweise zur Interpretation von Prüfergebnissen gegeben. Außerdem wurden inzwischen ausgehend von den Ergebnissen des Forschungsvorhabens erste Autoklaven-Ringversuche in drei Prüfinstitutionen initiiert.
This paper deals with the determination of test criteria for the durability assessment of polyvinyl chloride (PVC)-based geosynthetic barriers (GBR-P) products in tunnel sealing systems. In the project different products for road tunnel application are investigated by systematic long time storage in hot water using a new test procedure based on SIA V 280 standard (test no. 13) and EN 14415. The objective of this research project is to derive suitable exposure conditions and criteria for a practical testing procedure with regard to service lifetimes of up to 100 years. For that test temperature and time as well as the best suitable test medium have been investigated in a structured way. To verify the results of the new test procedure the material properties of GBR-P samples removed from older road tunnels are investigated. Based on the presented results of the still on-going research program some preliminary conclusions regarding the updating of the German regulations for road tunnel sealing systems (ZTV-ING part 5 section 5 and TL/TP KDB) are given.