Filtern
Schlagworte
- Fahrerassistenzsystem (4) (entfernen)
The sequence of accident events can be classified by three essential phases, the pre-crash-sequence, the crash-sequence and the post-crash-sequence. The level of reliability of the information in the GIDAS-database (German In Depth Accident Study) is provided predominantly on the passive side. The period to evaluate active safety systems begins already in the pre-crash-sequence. The assessment of the potential of sensor- or communication-based active safety systems can only be accomplished by a detailed analysis of the pre-crash-phase. Hence the necessity to analyze the early period of the accident event in detail arises. This is possible with the help of the digital sketches of the accident site and the simulation of the accident by a simulation method of the VUFO GmbH. After simulating the pre-crash scenario it is possible to generate additional and standardized data to describe the pre-crash-sequences of an accident in a very high detail. These data are documented in a second database called the GIDAS Pre-Crash-Matrix (PCM). The PCM contains various tables with all relevant data to reproduce the pre-crash-sequence of traffic accidents from the GIDAS database until 5 seconds before the first collision. This includes parameters to describe the environment data, participant data and motion or dynamic data. This paper explains the creation of the PCM, the simulation itself and the contents and structure of the PCM. With this information of the pre-crash-sequence for various accident scenarios an improved benefit estimation and development of active safety systems can be made possible.
In the last years various new driver information and driver assistance systems made their way into modern vehicles and there are yet countless systems underway. However, expenses for both, the development and the construction of these systems are tremendous. Therefore the interest of evaluating systems keeps growing steadily, not only regarding the results of systems developed in the last years but also regarding system ideas. Only if at least a rough benefit estimation is given, the industry can decide which development should be supported. However, there is still a lack of transparency of possible and useful methods for these kinds of estimations. These were analyses and structured in this study.