Filtern
Dokumenttyp
- Konferenzveröffentlichung (15) (entfernen)
Schlagworte
- Verkehrsinfrastruktur (15) (entfernen)
Fire incidents are among the most relevant for people in a tunnel. Therefore, it is important to be sufficiently prepared for such events. A large scale fire test is to be used to help evaluate the initial burning duration and the time it takes for the fire to spread to other vehicles in the tunnel, and in particular how long it takes for a truck carrying wooden pallets to catch fire, taking into consideration the extremely high temperatures. The goal, therefore, is to determine the time it takes for a fire to spread to other vehicles in the tunnel. In the large scale fire test, an accident in a tunnel with one-way traffic is simulated between a truck loaded with approximately 3.7 t of wooden Europol pallets and a passenger car. Directly behind each of the vehicles involved in the accident there is another car which stops at a distance of 1.0 m. Approximately 300 litres of burning diesel are discharged from the truck's fuel tank, which is simulated by using approximately 400 litres of isopropanol. A 10 m-² burning pool forms underneath the truck. Other objectives of the large scale fire test are the validation of the CFD models and the evaluation of the progression of the thermal release ratios estimated for the simulation. The thermal release ratios generated in the test are determined and evaluated using various models.
Risk-based approach for the protection of land transport infrastructure against extreme rainfall
(2016)
The aim of the research project "Risk based approach for the protection of transport infrastructure against extreme rainfall RAINEX" is the development of a practical methodology for the identification and assessment of both vulnerable as well as critical transport infrastructures towards extreme rainfall events consequences. The developed methodology is based on expert knowledge and includes qualitative and semi-quantitative analyses regarding the assessment of the vulnerability and criticality of relevant transport infrastructures. The process chain from the spatial rainfall to the concentrated runoff in the river channel was shown to assess the local hazard resulting in the local risk. The main result of the project is a practice-oriented and applicable methodology and a comprehensive and well-developed security handbook.
HORN stellt in ihrem Eingangsreferat den "Neuen Bundesverkehrswegeplan und die SUP in der Verkehrswegeplanung" vor. Das zentrale Element des in der Regel auf 10 bis 15 Jahre angelegten Plans ist die aus europäischen Vorgaben abgeleitete Öffentlichkeitsbeteiligung. Diese erfordert bei der Erstellung des Bundesverkehrswegeplans einen kontinuierlichen Kommunikationsprozess. Zugleich betonte HORN die starke Unterfinanzierung des aktuellen Plans. Der Erhaltung der vorhandenen Verkehrsinfrastruktur komme in den Bereichen Straße, Schiene und Wasser der Vorrang vor Neubauten zu. FEHLING plädiert in seinem Beitrag "Die Straße im Kontext des öffentlichen Personennahverkehrs" für eine nahverkehrsfreundliche Planung und Gestaltung des Straßenraums. Die Planungen verschiedener Verkehrsträger und Planungsebenen müssten aufeinander aber auch mit straßenverkehrsrechtlichen Anordnungen abgestimmt werden. Die entsprechende Koordination sei allerdings verbesserungsbedürftig. Namentlich die Vernetzung der Nahverkehrsplanung mit anderen Planungsebenen müsse ausgebaut werden. KUGELE berichtet in seinem Beitrag "Selbstfinanzierte Straßen" für eine längerfristige Verlässlichkeit der Verkehrsfinanzierung. Gegenwärtig fließe nur etwa die Hälfte der Abgaben aus dem Verkehr dem Gesamtverkehrssystem auch wieder zu. Diese Mittel müssten gesteigert und längerfristig für den Verkehr verfügbar gemacht werden, etwa durch längerfristige Leistungs- und Finanzierungsvereinbarungen oder durch Sondervermögen. Der abschließende Beitrag "Das neue Vergaberecht" von SIEGEL behandelt drei neue EU-Vergaberichtlinien, die am 17.04.2014 in Kraft getreten und nun binnen zweier Jahre umzusetzen sind. Nach dem neuen Recht können künftig ökologische und soziale Kriterien verstärkt eine Rolle bei der Vergabe von öffentlichen Aufträgen spielen. Diese neuen Richtlinien vergrößern indes die Nachweispflichten und den bürokratischen Aufwand. Neben das Kriterium des "wirtschaftlich günstigsten Angebots" zählt zudem nunmehr auch das beste Preis-Leistungs-Verhältnis.
In der Vergangenheit stiegen die Verkehrsbelastung und der Anteil des Schwerverkehrs auf deutschen Straßen und Autobahnen nahezu stetig. Dies wird sich auch in der Zukunft fortsetzen. Um auch zukünftig Mobilität gewährleisten zu können, sind Bauweisen mit maximaler Nutzungsdauer und minimalen Erhaltungsaufwendungen erforderlich. In Deutschland werden Betonfahrbahndecken als unbewehrte direkt befahrene Betonfahrbahnplatten mit Querfugen in regelmäßigen Abständen gefertigt und für Nutzungsdauern von 30 Jahren konzipiert. Die Querfugen stellen dabei den schwächsten Bereich in der Konstruktion dar. Betonfahrbahndecken können auch als Durchgehend Bewehrte Betonfahrbahndecke gefertigt werden. Dabei stellt sich ein freies Rissbild mit schmalen Plattenstreifen ein. Um eine Querkraftübertragung zu sichern, wird die Rissöffnungsweite durch die Anordnung einer durchgehenden Längsbewehrung beschränkt. Die Erfahrungen zeigen, dass mit dieser Bauweise eine längere Nutzungsdauer und ein höherer Fahrkomfort erreicht werden und weniger Erhaltungsmaßnahmen erforderlich sind. Durchgehend Bewehrte Betondecken eignen sich besonders gut für eine Asphaltüberbauung, da es keine Querfugen als Störstellen gibt. Diese Komposition hat das Potenzial für eine Nutzungsdauer von 50 Jahren und erfordert geringere Kosten, wenn man den gesamten Lebenszyklus betrachtet. Um baupraktische Erfahrungen zu sammeln, wurde im Jahr 2011 auf der Bundesautobahn (BAB) A 94 bei Forstinning in Bayern eine Versuchsstrecke eingerichtet. Diese besteht aus drei Abschnitten von je etwa 4 km Länge: Durchgehend Bewehrte Betondecke mit DSH-V-Überbauung, unbewehrte Betondecke in Plattenbauweise mit DSH-V-Überbauung und unbewehrte Betondecke in Plattenbauweise mit Grinding-Oberfläche. Erste Ergebnisse bezüglich Rissbildung, Bewegungen an den Endspornen, Haftverhalten des Blacktopping und der Schallmessungen liegen vor.
Road accidents are typically analyzed to address influences of human, vehicle, and environmental (primarily infrastructure) factors. A new methodology, based on a "Venn diagram" analysis, gives a broader perspective on the probable factors, and combinations of factors, contributing both to the occurrence of a crash and to sustaining injuries in that crash. The methodology was applied to 214 accidents on the Mumbai-Pune expressway. Factors contributing to accidents and injuries were addressed. The major human factors influencing accidents on this roadway were speeding (30%) and falling asleep (29%), while injuries were primarily due to lack of seat belt use (46%). The leading infrastructure factor for injuries was impact with a roadside manmade structure (28%), and the main vehicle factor for injuries was passenger compartment intrusion (73%). This methodology can help identify effective vehicle and infrastructure-related solutions for preventing accidents and mitigating injuries in India.
Im von der DG Home (CIPS Program) geförderten Projekt "SecMan " Security Manual for Road Infrastructures" wurde ein vierstufiges Verfahren zur Identifikation kritischer Straßeninfrastrukturen, ihre Bewertung hinsichtlich diverser von Menschen verursachter Gefahren sowie die Bestimmung effektiver Schutzmaßnahmen entwickelt. Diese Ergebnisse wurden in einem ganzheitlichen "best-practice" Handbuch zusammen getragen, welches einen trans-nationalen Sicherheitsmanagement-Ansatz für Betreiber und Eigentümer von Straßeninfrastrukturen in Europa ermöglicht. Im Folgenden wird die entwickelte Methodik vorgestellt, ausgehend von der Bewertung der Netzkritikalität über die Attraktivität und Vulnerabilität eines Bauwerks hin zu einer Bewertungsmethodik für die Auswahl geeigneter Schutzmaßnahmen.
Various climate projections predict changing climatic parameters like temperature, precipitation, wind speed etc. for Germany. This could have severe impacts on road transport infrastructure as well as road traffic itself. At the Federal Highway Research Institute (Bundesanstalt für Straßenwesen (BASt) a strategy was developed to adapt roads and engineering structures to the impacts of climate change. The strategy "Anpassung der Straßenverkehrsinfrastruktur an den Klimawandel / Adaptation of the road infrastructure to climate change (AdSVIS)" comprises currently about 15 projects. On the basis of the identification of the hazards and the combination of the climate and road network data, the road transport infrastructure which might be affected is to be determined. Adaptation measures are to be developed for the identified risk areas and assessed as to their effectiveness. Special attention is given to international cooperation since climate change is a truly global challenge.
W.-D. FRIEDRICH schildert in seinem Einführungsvortrag die praktischen Erfahrungen und Probleme der DEGES Deutsche Einheit, Fernstraßenplanungs- und -bau GmbH beim straßenrechtlichen Grunderwerb. Die DEGES ist dazu übergegangen, den Grunderwerb unter Einbeziehung von Dienstleistungsfirmen zu realisieren, was sich als effizient, kostengünstig und flexibel erwiesen hat. Im Zuge der Vorbereitung und Durchführung von Besitzeinweisungsverfahren bilden namentlich der Nachweis der Dringlichkeit und die Besitzeinweisung für Ausgleichs- und Ersatzmaßnahmen Problemschwerpunkte. Im Zentrum der Rechtsstreitigkeiten der eigentlichen Enteignungsverfahren steht die Verkehrswertermittlung, wobei FRIEDRICH beispielhaft die Bewertung von Grundstücken, in denen bergfreie Bodenschätze lagern, und die kontrovers umstrittene Frage der Berücksichtigung von Betriebsprämien als gesicherte Rechtsposition diskutiert. E. ALLESCH berichtet über aktuelle Rechtsfragen der straßenrechtlichen Enteignung, die sich aus Sicht der Verwaltungsgerichtsbarkeit stellen. Er verdeutlicht das Zusammenspiel der Vorschriften des Bundesfernstraßengesetzes (-§ 18f, -§ 19 FStrG) mit dem Enteignungsrecht der Länder und behandelt als Einzelprobleme unter anderem die Probleme der Enteignung und Besitzeinweisung auf Grundlage eines isolierten Straßenbebauungsplans, die Fragen der Wirksamkeit und Durchsetzbarkeit einer Einigung in und ausserhalb des Enteignungsverfahrens, das Erfordernis des sofortigen Baubeginns im Sinne des -§ 18f Abs. 1 Satz 1 FStrG und die Frage nach dem Ausschluss "weiterer Voraussetzungen" nach -§ 18f Abs. 1 Satz 3 FStrG. H. SCHMITZ liefert einen Bericht zum Stand der geplanten Vereinheitlichung der Fachplanungsgesetze im Verwaltungsverfahrensgesetz, die insbesondere auf eine Verallgemeinerung der Regelungen des Infrastrukturplanungsbeschleunigungsgesetzes abzielt. Er stellt dabei namentlich den Inhalt des Musterentwurfs der Verwaltungsverfahrensrechtsreferenten von Bund und Ländern mit den letzten Fortschreibungen vor. T. TEGTBAUER beschreibt in ihrem Beitrag zur "Privatisierung im Straßenbau" die aktuellen Erfahrungen des Bundes mit dem sog. A-Modell. Einer Darstellung des Konzepts selbst folgen eine Chronologie der Entwicklung der A-Modelle, eine Vorstellung der vier A-Modell-Pilotprojekte sowie des strukturierten Verhandlungsverfahrens und insbesondere der Wirtschaftlichkeitsuntersuchung i. S. v. -§ 7 BHO. Die Auswertung der vier Pilotprojekte ergab, dass die selbst gesteckten Ziele mit den Pilotprojekten teilweise erreicht wurden, weshalb der Bund mit den Ländern bereits acht weitere Projekte abstimmen konnte. G. RECKER vervollständigt dieses Bild aus Sicht eines Landes und berichtet über die Grundsanierung und den erforderlichen Ausbau auf sechs Streifen eines Streckenabschnitts der BAB 1, die die stark befahrenen Strecken von Schleswig-Holstein bis Saarbrücken und die Seehäfen Norddeutschlands mit dem Westen Deutschlands verbindet und Teil der transeuropäischen Netze ist. Im Ergebnis ist der Aufwand für das gebündelte Vergabeverfahren im Vergleich zur Durchführung von sieben Einzelverfahren geringer ausgefallen, wobei weitere Synergieeffekte als möglich angesehen werden. Allerdings ist gerade in der Umsetzungsphase auch auf Seiten des Konzessionsnehmers noch die erforderliche Routine auszubauen.
Am 42. Erfahrungsaustausch über Erdarbeiten im Straßenbau (EAT) am 5. und 6. Mai 2010 nahmen neben Vertretern des Bundesministeriums für Verkehr, Bau- und Stadtentwicklung und der Straßenbaubehörden der Länder auch Vertreter der Bundesanstalt für Wasserbau, der Deutschen Bahn AG und der DEGES teil. Der Erfahrungsaustausch dient dazu, Erfahrungen mit neuen Bauweisen und der Anwendung neuer Regelwerke und Prüfverfahren mitzuteilen und zu diskutieren. Der 42. EAT hatte vier verschiedene Themen-Schwerpunkte. Zum Einen "Regelwerke und Normung", es wurde die Arbeitsgruppe des CEN und deren Aufgaben bei der europäischen Normung "Erdarbeiten" vorgestellt, über die Qualitätssicherung von Geokunststoffen informiert und außerdem Neuerungen in den RAP Stra 2010 und der aktuelle Überarbeitungsstand der Richtlinien für die Straßenentwässerung (ZTV Ew, RiStWag und RAS-Ew) erläutert. Die Erfahrungsberichte gewährten Einblicke über neue Bauverfahren und Baustoffe. Es wurde der Vortrag vom 41. EAT über die Anwendung von Glasschaumgranulat als Leichtschüttung mit 2-jähriger Erfahrung fortgeführt. Ferner wurde über die Verbesserung des Verformungsverhaltens organischer Böden am Beispiel der Querung eines Moorgebietes in Brandenburg und der Überwindung eines Todeisloches beim Bau der A7 im Allgäu berichtet. Ebenfalls wurden die Vorteile und erforderlichen Einschränkungen (Risiken) der Beobachtungsmethode bei der Sicherung standsicherheitsgefährdeter Einschnittsböschungen erläutert. Ein weiteres Thema waren die Auswirkungen des Klimawandels auf die Straßeninfrastruktur. In verschiedenen Szenarien wurde über den Klimawandel mit Relevanz für die Straße und über Risiken von Hang- und Böschungsrutschungen durch die Zunahme von Extremwetterereignissen informiert. An drei Fallbeispielen in Baden Württemberg, Rheinland-Pfalz und Niedersachsen wurde über Böschungsrutschungen und deren Sanierungsmaßnahmen berichtet. Den letzten Schwerpunkt bildeten die Bauverträge mit funktionalen Anforderungen. Es wurde über den Funktionsbauvertrag im Bundesfernstraßenbau, die Vorstellung der ZTV-Funktion E an Hand der BAB A6 bei Nürnberg und über die ZTV Funktion Ew berichtet. Die Fachexkursion am 6. Mai 2010 führte zunächst zur Verkehrs- und Betriebszentrale Nordbayern, die eindrucksvoll über ihre Aufgabengebiete, einschließlich des verkehrstelematischen, betriebs- und tunneltechnischen Systems informierte. Anschließend wurde über weitere Details des sechsstreifigen Ausbaus der BAB A6 zwischen der AS Roth und dem AK Nürnberg-Süd informiert. Im Anschluss erfolgten unter fachkundiger Führung die Besichtigung der Erdbaumaßnahmen an der Main-Donau-Kanalbrücke und der Rückbau des Lärmschutzwalls Kornburg inklusive der Erläuterungen der unvorhergesehenen Probleme bei der Aufbereitung des alten Lärmschutzwalls.
This paper describes the methodology for the assessment of the socio-economic impact of SAFESPOT applications. The applications selected for the assessment cover vehicle to vehicle (v2v) as well as vehicle to infrastructure (v2i) communication systems. The applications address main problem areas of road safety: accidents at intersections, accidents due to hazardous road and weather conditions and accidents due to over speeding and inappropriate distance. The assessment methodology relies in its core on cost-benefit analysis (CBA) as the most widespread tool to assess the profitability of applications form the society point of view. The assessment is however not limited to CBA but also considers the economic effects for particular stakeholder groups such as users, public authorities and the like. Their individual cost and benefits can be investigated in stakeholder analyses. Both elements, CBA and stakeholder analysis, form an integrated assessment approach which is applied here. The assessment makes use of the sound methodological base which was provided by projects such as SEiSS and eIMPACT. Some characteristics of co-operative systems however call for special attention within the assessment. Most prominently, the assessment will concentrate on a bundle of applications. The impact of this bundle will be assessed under the conditions of different business and service models. These issues will be addressed in the paper. Moreover, this paper also provides insight in likely patterns of results and first results of socio-economic impact assessment itself.