Sonstige
Refine
Document Type
- Conference Proceeding (9) (remove)
Has Fulltext
- no (9) (remove)
Keywords
- Tunnel (6)
- Bewertung (4)
- Evaluation (assessment) (4)
- Europa (3)
- Europe (3)
- Prüfverfahren (3)
- Risikobewertung (3)
- Risk assessment (3)
- Safety (3)
- Sicherheit (3)
- Transport infrastructure (3)
- Abdichtung (2)
- Bau (2)
- Construction (2)
- Dauerhaftigkeit (2)
- Durability (2)
- Gefahrenabwehr (2)
- Geomembran (2)
- Geomembrane (2)
- Lebenszyklus (2)
- Life cycle (2)
- Method (2)
- PVC (2)
- Polyvinylchloride (2)
- Research project (2)
- Security (2)
- Test method (2)
- Verkehrsinfrastruktur (2)
- Waterproofing (2)
- Ageing (1)
- Alterung (mater) (1)
- Bemessung (1)
- Brand (1)
- Bridge (1)
- Bridge management system (1)
- Brücke (1)
- Brücken Management System (1)
- Climate change (1)
- Costs (1)
- Critical path method (1)
- Cross section (1)
- Design (1)
- EU (1)
- Economic efficiency (1)
- Evacuation (1)
- Evakuierung (1)
- Festigkeit (1)
- Fire (1)
- Flooding (1)
- Forschungsarbeit (1)
- Fugenfüllung (1)
- Klimawandel (1)
- Kosten (1)
- Langfristig (1)
- Lebensdauer (1)
- Long term (1)
- Mathematical model (1)
- Netzplantechnik (1)
- Oxidation (1)
- Planning (1)
- Planung (1)
- Polyolefin (1)
- Polyvinylhydrocarbon (1)
- Probability (1)
- Querschnitt (1)
- Rain (1)
- Rechenmodell (1)
- Regen (1)
- Richtlinien (1)
- Road network (1)
- Sealing compound (1)
- Service life (1)
- Simulation (1)
- Specifications (1)
- Straßennetz (1)
- Strength (mater) (1)
- Test procedure (1)
- Verfahren (1)
- Verfahren ; Verkehrsinfrastruktur (1)
- Wahrscheinlichkeit (1)
- Wasser (1)
- Water (1)
- Wirtschaftlichkeit (1)
- Überschwemmung (1)
Institute
- Abteilung Brücken- und Ingenieurbau (9) (remove)
Fire incidents are among the most relevant for people in a tunnel. Therefore, it is important to be sufficiently prepared for such events. A large scale fire test is to be used to help evaluate the initial burning duration and the time it takes for the fire to spread to other vehicles in the tunnel, and in particular how long it takes for a truck carrying wooden pallets to catch fire, taking into consideration the extremely high temperatures. The goal, therefore, is to determine the time it takes for a fire to spread to other vehicles in the tunnel. In the large scale fire test, an accident in a tunnel with one-way traffic is simulated between a truck loaded with approximately 3.7 t of wooden Europol pallets and a passenger car. Directly behind each of the vehicles involved in the accident there is another car which stops at a distance of 1.0 m. Approximately 300 litres of burning diesel are discharged from the truck's fuel tank, which is simulated by using approximately 400 litres of isopropanol. A 10 m-² burning pool forms underneath the truck. Other objectives of the large scale fire test are the validation of the CFD models and the evaluation of the progression of the thermal release ratios estimated for the simulation. The thermal release ratios generated in the test are determined and evaluated using various models.
Risk-based approach for the protection of land transport infrastructure against extreme rainfall
(2016)
The aim of the research project "Risk based approach for the protection of transport infrastructure against extreme rainfall RAINEX" is the development of a practical methodology for the identification and assessment of both vulnerable as well as critical transport infrastructures towards extreme rainfall events consequences. The developed methodology is based on expert knowledge and includes qualitative and semi-quantitative analyses regarding the assessment of the vulnerability and criticality of relevant transport infrastructures. The process chain from the spatial rainfall to the concentrated runoff in the river channel was shown to assess the local hazard resulting in the local risk. The main result of the project is a practice-oriented and applicable methodology and a comprehensive and well-developed security handbook.
Im Rahmen eines von der Bundesanstalt für Straßenwesen (BASt) initiierten Forschungsvorhabens (15.449/2007/ERB: "Prüfverfahren zur Beurteilung der Lebensdauer von Kunststoffdichtungsbahnen für Straßentunnel") wurden anhand von Untersuchungen an Kunststoffdichtungsbahnen (KDB) auf Basis von Polyolefinwerkstoffen die Möglichkeiten der Beurteilung der oxidativen Langzeitbeständigkeit sondiert. Im Mittelpunkt stand die Erprobung des Autoklaventests in Anlehnung an DIN EN ISO 13438 (Methode C1/C2) an ausgewählten, für den Tunnelbau repräsentativen marktüblichen KDB-Produkten. Die Untersuchungen im Autoklaven bei erhöhten Temperaturen (60 -°C, 70 -°C und 80 -°C) und Sauerstoffdrücken (11, 21 und 51 bar) wurden durch vergleichende Versuche im Wärmeschrank (Ofen) bei erhöhter Temperatur (85 -°C) in Anlehnung an DIN EN 14575 ergänzt. Die KDB-Produkte wurden außerdem einer eingehenden Materialcharakterisierung (Zugprüfung, OMA, DSC) unterzogen. Weiterhin wurden Bauwerksdaten recherchiert und auf ihre Nutzbarkeit zur Bewertung und Prüfbarkeit der Langzeitbeständigkeit von KDB in Tunneln betrachtet. Ziel war auch, die Anwendbarkeit des bisher vorgeschlagenen Extrapolationsmodells zur Auswertung der Ergebnisse von Autoklaventests an im Tunnelbau marktüblichen Produkten für Nutzungsdauern über 25 Jahre zu überprüfen und zur Entwicklung eines geeigneten Prüfverfahrens beizutragen. Der Beitrag geht auf Ergebnisse des Vorhabens ein und zeigt erste Schlussfolgerungen und weiteren Untersuchungsbedarf auf. Die Ergebnisse werden in den "Empfehlungen zu Dichtungssystemen im Tunnelbau EAG-EDT" des Arbeitskreises 5.1 "Kunststoffe in der Geotechnik und im Wasserbau" berücksichtigt, deren 2. Auflage in Vorbereitung ist. Aspekte des thermischen Verhaltens der eingesetzten Werkstoffe sowie mögliche Anpassungen der Prüfrandbedingungen für die Autoklaventests werden ergänzt und Hinweise zur Interpretation von Prüfergebnissen gegeben. Außerdem wurden inzwischen ausgehend von den Ergebnissen des Forschungsvorhabens erste Autoklaven-Ringversuche in drei Prüfinstitutionen initiiert.
This paper deals with the determination of test criteria for the durability assessment of polyvinyl chloride (PVC)-based geosynthetic barriers (GBR-P) products in tunnel sealing systems. In the project different products for road tunnel application are investigated by systematic long time storage in hot water using a new test procedure based on SIA V 280 standard (test no. 13) and EN 14415. The objective of this research project is to derive suitable exposure conditions and criteria for a practical testing procedure with regard to service lifetimes of up to 100 years. For that test temperature and time as well as the best suitable test medium have been investigated in a structured way. To verify the results of the new test procedure the material properties of GBR-P samples removed from older road tunnels are investigated. Based on the presented results of the still on-going research program some preliminary conclusions regarding the updating of the German regulations for road tunnel sealing systems (ZTV-ING part 5 section 5 and TL/TP KDB) are given.
Straßentunnel mit integriertem Rettungsweg: Konstruktions- und betriebliche Sicherheitsaspekte
(2009)
Infolge der seit 2003 in den RABT formulierten schärferen Sicherheitsanforderungen ist für Gegenverkehrstunnel bei Neuplanungen und bautechnischen Nachrüstungen häufig die Anordnung eines parallel zur Hauptröhre verlaufenden Rettungsstollens erforderlich. Untersuchungen der Bundesanstalt für Straßenwesen (BASt) zur Wirtschaftlichkeit verschiedener aktueller und auch neuer Querschnittsvarianten haben gezeigt, dass insbesondere ein Querschnitt mit integriertem begehbarem Rettungsweg unter bestimmten Voraussetzungen Kostenvorteile gegenüber der Regellösung mit parallelem Rettungsstollen bietet. In ergänzenden Untersuchungen wurden konstruktive und sicherheitstechnische Detailfragen für einen Regelquerschnitt mit integriertem Rettungsweg untersucht und bewertet und ein Kostenvergleich mit der Regellösung mit parallelem Rettungsstollen wurde durchgeführt.
Tunnel in Spritzbetonbauweise werden in der Regel mit einem Abdichtungssystem aus Kunststoffdichtungsbahnen (KDB) gegen das anstehende Bergwasser abgedichtet. Die Tunnelabdichtungen aus KDB müssen dabei über die gesamte Nutzungsdauer des Bauwerks von in der Regel 130 Jahren zuverlässig ihre Funktion erfüllen. Ein einfacher Austausch der KDB oder der Einbau einer gleichwertigen Alternative ist in der Regel nicht, oder nur mit erheblichem Aufwand möglich. Bislang existieren national und international keine abgesicherten Prüfkriterien, die eine Bestimmung der Langzeitbeständigkeit von KDB über die geforderte Nutzungsdauer von mindestens 100 Jahren ermöglichen. Im vorliegenden Beitrag werden Untersuchungsergebnisse eines BASt Forschungsprojektes präsentiert, in dem Prüfkriterien für die Abschätzung der Langzeitbeständigkeit von KDB aus PVC-P hergeleitet werden. In diesem Projekt werden verschiedene marktübliche KDB für die Tunnelabdichtung mit einem beschleunigten Prüfverfahren "Lagerung in heißem Wasser" systematisch auf ihr Alterungsverhalten hin untersucht. Das hierfür verwendete Immersionsprüfverfahren wurde neu entwickelt und basiert auf der SIA V 280 (Prüfung Nr. 13) und DIN EN 14415. Ziel der Untersuchungen ist es, die erforderlichen Prüfkriterien zu definieren, die für eine praxisgerechte Abschätzung der Nutzungsdauer von mindestens 100 Jahren erforderlich sind. Hierfür werden beispielsweise die Einlagerungsdauer, die Einlagerungstemperatur und das Prüfmedium strukturiert untersucht. Zum Vergleich der Prüfergebnisse aus dem Immersionsprüfverfahren werden Untersuchungen an ausgebauten KDB Proben aus 2 älteren Straßentunneln herangezogen. Die Ergebnisse des Forschungsvorhabens sollen in die Fortschreibung des nationalen Regelwerks für den Straßentunnelbau (TL/TP KDB) einfließen.
The first stage of the work has been to collate information on bridge assessment from the participating countries. In the later stages, the aim is to provide guidelines that reflect the current best practices, a methodology that will allow for future development and sufficient flexibility to accommodate variations in national priorities as the process of harmonisation is pursued. The following tasks fall within the scope of the project: (1) a review of current procedures and standards used for bridge assessment in Europe; (2) the development of models for taking into account the bridge specific traffic conditions and material properties; (3) the use of reliability methods based on a probabilistic approach for bridge assessment including the use of measurements for updating the reliability of structural elements; and (4) the provision of recommendations for methods and procedures that can be adopted for the assessment module of the management framework highlighting where further development will be beneficial.
In the project SECMAN " SECurity MANual " a simple four-step procedure for the identification of critical road infrastructures, assessment of these infrastructures regarding various man-made threats and the determination of effective protection measures was developed. These methodologies are summarized and combined into a comprehensive best-practice manual which allows for a trans-national structured and holistic security-risk-management approach for owners and operators of road infrastructures in Europe. This paper presents the developed methodology starting from the assessment procedures of a network's criticality over an object's attractiveness and vulnerability to the selection process of appropriate protection measures.
Improving the security of critical road infrastructure is a major task for owners and operators of tunnels and bridges in the European TEN-T Network (Trans-European Networks of Transport) (European Parliament and Council 1996). Up to now, there has not been a systematic procedure for identifying and assessing critical infrastructure objects and selecting appropriate protection measures. The EC FP7 project SeRoN for the first time presents an innovative methodology in order to support road owners and operators in handling this complex task. This paper describes the methodology and project results in detail by giving an introduction into its practical application.