Abteilung Brücken- und Ingenieurbau
Filtern
Erscheinungsjahr
- 2012 (2) (entfernen)
Dokumenttyp
Schlagworte
- Abdichtung (1)
- Bau (1)
- Bearing capacity (1)
- Bemessung (1)
- Berechnung (1)
- Bridge (1)
- Brücke (1)
- Calculation (1)
- Condition survey (1)
- Construction (1)
The German highway network hast o face new challenges in the near future, e.g. increasing traffic density and loads, climate change effects and new quality requirements regarding sustainability. It is necessary to come up with foresighted concepts in the present to be prepared for these challenges. Therefore it is important to adapt and enhance innovative attempts, which take changing impacts into account. One goal of these efforts is the development of adaptive systems for the provision of information and a holistic evaluation in real time. The paper describes the recent research and developments on a system for information and holistic evaluation in real time, taking into account sensor networks, evaluation procedures and their implementation in existing maintenance and inspection strategies.
Infolge der gestiegenen Sicherheitsanforderungen für Straßentunnel und des daraus folgenden umfangreichen sicherheitstechnischen Nachrüstungsprogramms werden im Straßentunnelbau häufiger Rettungsstollen realisiert. Die Ausführung von Rettungsstollen wurde bisher projektspezifisch festgelegt. Mit Aufnahme der Anforderungen an Rettungsstollen in das technische Regelwerk wird die einschalige Spritzbetonbauweise als Regelbauweise festgelegt, sofern die hydrogeologischen Bedingungen dies zulassen. Durch den Einsatz von wasserundurchlässigen Spritzbeton - gegebenenfalls unter Zugabe von Stahlfasern - kann die Dichtigkeitsklasse 3 nach der ZTV-ING sicher erreicht werden. Die Läenge eines begehbaren Rettungsstollens mit einem lichten Querschnitt von 2,25 m x 2,25 m ist auf 3000 m begrenzt. Bei längeren Rettungsstollen ist ein befahrbarer Querschnitt von 3,50 m x 3,50 m vorzusehen.