24 Brückenentwurf
Filtern
Sprache
- Englisch (3) (entfernen)
Schlagworte
- Bauwerksmonitoring (3)
- Bridge (3)
- Brücke (3)
- Structural health monitoring (3)
- Ausrüstung (2)
- Belastung (2)
- Bewertung (2)
- Datenbasis (2)
- Equipment (2)
- Evaluation (assessment) (2)
- Load (2)
- Sensor (2)
- Traffic count (2)
- Verkehrserhebung (2)
- Weather (2)
- Beton (1)
- Concrete (1)
- Data base (1)
- Data basis (1)
- Data processing (1)
- Datenverarbeitung (1)
- Dauerhaftigkeit (1)
- Durability (1)
- Lebenszyklus (1)
- Life cycle (1)
- Maintenance (1)
- Prestressed (1)
- Prestressed concrete (1)
- Spannbeton (1)
- Traffic concentration (1)
- Unterhaltung (1)
- Verkehrsstärke (1)
- Vorspannung (1)
- Wetter (1)
- Witterung (1)
The case study "Digital Test Area Autobahn" is presented. A new built (September 2016) pre-stressed concrete bridge is equipped with different monitoring systems for the detection of traffic load, climatic influence and the reaction of the bridge. Possibilities for the implementation of a VoI (Value of Information) analyses are presented.