The German highway network hast o face new challenges in the near future, e.g. increasing traffic density and loads, climate change effects and new quality requirements regarding sustainability. It is necessary to come up with foresighted concepts in the present to be prepared for these challenges. Therefore it is important to adapt and enhance innovative attempts, which take changing impacts into account. One goal of these efforts is the development of adaptive systems for the provision of information and a holistic evaluation in real time. The paper describes the recent research and developments on a system for information and holistic evaluation in real time, taking into account sensor networks, evaluation procedures and their implementation in existing maintenance and inspection strategies.
The German highway network is facing new challenges in the near future. The structures have to deal with increasing traffic loads, climate change effects and new requirements regarding sustainability while they are getting older and budget cuts can be expected. To guarantee a reliable highway network, it will be vital to adapt and enhance innovative approaches. Current bridge management relies on the results of conventional bridge inspections and thus has certain limitations when it comes to insufficient load bearing capacity and other systematic weaknesses. Therefore, new approaches for real time condition assessment of critical road infrastructure elements are to be developed.
Mobility is a central requirement for economic growth, employment and participation of each individual in social life. This basic principle of the BMVI (Federal Ministry of Transport and Digital Infrastructure) requires an intact and functional infrastructure. In a context of increasing investments over the next few years, it will be relevant to develop a network related systematic procedure to be part of the structural maintenance of the federal highway network. In the planning of maintenance measures, the knowledge about the state of structural performance and its long-term development is of central importance. In the following, a method is presented which allows the mechanically and statistically reliable assessment and prognosis of structural performance of concrete pavements. In addition, the application and procedure are applied to a case study.
The current maintenance management for bridges is mainly based on visual inspection and aims at the repair of identified damages. In the project cluster "Smart Bridge" an adaptive system for holistic evaluation in real time is developed. The following pilot studies show significant aspects of the Smart Bridge. Within the research project "Digital Test Area Autobahn" a new constructed prestressed concrete bridge is implemented with instrumented expansion joints and bearings, a "RTMS©" and a sensor network. By using analytical bridge models and evaluation methods the condition and reliability of the bridge as well as the remaining service life is determined. In the pilot study "duraBASt" sensors for the detection of durability and structural safety as well as data analyzing and evaluation procedures are investigated. The aim of this study is the partial implementation of the aspects: data collection, data processing and model development for condition assessment of the bridge.
This paper deals with the determination of test criteria for the durability assessment of polyvinyl chloride (PVC)-based geosynthetic barriers (GBR-P) products in tunnel sealing systems. In the project different products for road tunnel application are investigated by systematic long time storage in hot water using a new test procedure based on SIA V 280 standard (test no. 13) and EN 14415. The objective of this research project is to derive suitable exposure conditions and criteria for a practical testing procedure with regard to service lifetimes of up to 100 years. For that test temperature and time as well as the best suitable test medium have been investigated in a structured way. To verify the results of the new test procedure the material properties of GBR-P samples removed from older road tunnels are investigated. Based on the presented results of the still on-going research program some preliminary conclusions regarding the updating of the German regulations for road tunnel sealing systems (ZTV-ING part 5 section 5 and TL/TP KDB) are given.
Tempered road system
(2014)
The road performance is strongly influenced by climatic conditions. Winter conditions have massive impact on traffic security but also pavement lifetime decreases as an effect of temperature variation during wintertime and summertime. Heating and cooling of a pavement is a possibility to work against these impacts. To discuss the boundary conditions for an efficient construction and operation of a tempered road system a feasibility study has been made. The study shows the feasibility and identifies thermal energy buffering as a main challenge. When thinking of a fully regenerative operation of a large tempered road system (e.g. 20.000 m-²) the storage volume has to be too large for an economic and structurally engineered satisfactory solution. However, the location dependent usage of natural geothermal storage possibilities and as well smart alignment and construction promises a feasibility realization.
A flexible pedestrian legform impactor (FlexPLI) with biofidelic characteristics is aimed to be implemented within global legislation on pedestrian protection. Therefore, it is being evaluated by a technical evaluation group (Flex-TEG) of GRSP with respect to its biofidelity, robustness, durability, usability and protection level (Zander, 2008). Previous studies at the Federal Highway Research Institute (BASt) and other laboratories already showed good progress concerning the general development, but also the need for further improvement and further research in various areas. An overview is provided of the different levels of development and all kinds of evaluation activities of the Flex-TEG, starting with the Polar II full scale pedestrian dummy as its origin and ending up with the latest legform impactor built level GTR that is expected to be finalized by the end of the year 2009. Using the latest built levels as a basis, gaps are revealed that should be closed by future developments, like the usage of an upper body mass (UBM), the validation of the femur loads, injury risk functions for the cruciate knee ligaments and an appropriate certification method. A recent study on an additional upper body mass being applied for the first time to the Flex-GT is used as means of validation of recently proposed modified impact conditions. Therefore, two test series on a modern vehicle front using an impactor with and without upper body mass are compared. A test series with the Flex-GTR will be used to study both the comparability of the impact behavior of the GT and GTR built level as well as the consistency of test results. Recommendations for implementation within legislation on pedestrian protection are made.