Refine
Document Type
- Article (1)
- Part of a Book (1)
- Working Paper (1)
Keywords
- Temperatur (3) (remove)
Institute
- Abteilung Straßenverkehrstechnik (3) (remove)
As the data for road weather stations is used for online traffic control within section control systems, it is very important for the efficiency of the traffic control systems to be based on reliable data of a high quality. Therefore, a Test Site for checking the quality of road weather stations was established near Munich in Germany in 2003 and has been operational since then. In close co-operation with all participants (sensor manufacturers, road authorities, German Federal Research Institute, research and consultancy bodies), the overall goal was to improve the sensors" quality as well as to establish methods to detect failures in measurements. Furthermore, several improvements were carried out within the scope of the Test Site using the expertise of all participants and the infrastructure of the Test Site. The developments, reports and results obtained are both significant and helpful for manufacturers, road authorities, practitioners, research and consultancy.
This article reports on a two-year study (2006 to 2008) of the distribution of de-icing salts (NaCl) applied to the road and the influence of traffic on the effective times of the de-icing salts. The research was focused on the needed resting periods of de-icing salts on road surfaces. The study used sensors installed in two lanes of the Motorway A4 in the area of the Dresden-Hellerau Highway Surveillance Center (Germany), to measure air and ground temperatures, wind speed and direction, liquid film thicknesses and residual quantities of salt on the road surface during ongoing traffic at 5-minute intervals. The authors conclude with four observations that can be useful for applying de-icing salts more judiciously: preventive spreading is only sensible if applied timely, i.e. immediately prior to icing events to be expected; the time-frame for preventive spreading on the dry road surface is maximum 60 minutes and on the moist road surface maximum 120 minutes; by increasing spreading densities in preventive spreading, this timeframe cannot be extended; it is completely sufficient if the spreading width is adjusted in such a way that the outer wheel tracks are also covered by the spreading. Distribution across the entire width of the lane will be caused by the rolling traffic within a few minutes.
Im Ausschuss für Gefahrstoffe (AGS) des Bundesministeriums für Arbeit und Sozialordnung wurde ein Grenzwert für Bitumendämpfe beim Einbbau von Asphalt festgelegt. Dabei soll ein Wert von 10 mg/m3 der Summe der Kohlenwasserstoffe nicht überschritten werden. Dieser Wert scheint beim Einbau von Walzasphalt einhaltbar zu sein, bei Gussasphalt (GA) bestehen wegen der deutlich höheren Asphalttemperaturen von etwa 250 °C Zweifel. Für Gussasphalt wurde der Grenzwert für zwei Jahre ausgesetzt, mit dem Ziel, Messungen und erste Schritte der Emissionssenkung durchzuführen.