• search hit 2 of 8
Back to Result List

Monitoring during life cycle of bridges to establish performance indicators

  • In future, additional and more detailed data are needed about the current conditions of bridges for preventive maintenance management. Monitoring procedures are not merely able to provide key performance indicators for a specific point in time, but also over a period. These KPIs must be selected in such a way as to permit substantiated statements about the present and future condition of bridges. For this reason, greater efforts must be made to define the significant KPIs for the various types of bridges, and show how these figures can be reliably determined. Both the COST Action TU1402, and TU1406 offer important approaches which, properly combined, can deliver substantial added value to the calculation and description of the condition of bridges in the interest of proactive maintenance management.

Export metadata

Additional Services

Share in Twitter Search Google Scholar
Metadaten
Author:Peter Haardt, Ralph Holst
Document Type:Conference Proceeding
Language:English
Date of Publication (online):2018/09/25
Year of first publication:2017
Release Date:2018/09/25
Tag:Bauwerksmonitoring; Brücke; Datenbasis; Lebenszyklus; Unterhaltung
Bridge; Data base; Life cycle; Maintenance; Structural health monitoring
Comment:
Volltext: DOI:  https://doi.org/10.5592/CO/BSHM2017.4.2
Source:Joint COST TU1402 - COST TU1406 - IABSE WC1 Workshop: The Value of Structural Health Monitoring for the Reliable Bridge Management
Institutes:Abteilung Brücken- und Ingenieurbau / Abteilung Brücken- und Ingenieurbau
Dewey Decimal Classification:6 Technik, Medizin, angewandte Wissenschaften / 62 Ingenieurwissenschaften / 620 Ingenieurwissenschaften und zugeordnete Tätigkeiten
collections:BASt-Beiträge / ITRD Sachgebiete / 24 Brückenentwurf
BASt-Beiträge / ITRD Sachgebiete / 61 Unterhaltung und Instandsetzung

$Rev: 13581 $