TY - BOOK A1 - Fehn, Fabian A1 - Margreiter, Martin A1 - Spangler, Matthias A1 - Bogenberger, Klaus A1 - Emmermann, Birte A1 - Bengler, Klaus A1 - Vierkötter, Marcel A1 - Nedkov, Malte A1 - Feldges, Michael A1 - Holst, Lutz T1 - Begleitende Systemevaluation der Maßnahmen „Sicheres Ausleiten bei BAG-Standkontrollen“ T1 - Accompanying system evaluation of the measure “Safe Motorway Exit for Road-Side Checks” N2 - Ziel des Projektes war die Evaluierung einer technischen Ausleitmethode für Fahrzeuge an Kontrollplätzen im Rahmen von Standkontrollen des Bundesamts für Güterverkehr, um das händische Ausleiten durch das Kontrollpersonal in Zukunft zu ersetzen. An fünf deutschlandweit verteilten Standorten wurde die Technik, bestehend aus: Bedienstation, Kameratechnik und LED-Ausleittafel getestet, um ein gefahrloses Ausleiten von Fahrzeugen von Autobahnen zu ermöglichen. Die verwendete Software übermittelt die Kennzeichen, welche zuvor von einem Kamerasystem erfasst wurden und leitet diese dann inklusive eines Fahrzeugbildes an die das Kontrollpersonal weiter. Grundsätzlich ist eine Pulk- oder Individualausleitung der Fahrzeuge möglich. Am Pilotstandort Sophienberg, Bayern wurden empirische Untersuchungen zur Sicherheit und Funktionalität der Ausleittechnik durchgeführt, zusätzlich befragte man standortübergreifend fahrzeugführende Personen hinsichtlich der Ausführung und Darstellung der Ausleittafel. Durch eine Befragung des Kontrollpersonals wurde die höhere Sicherheit beim technischen Ausleiten bestätigt und Probleme herausgearbeitet, die dem Kontrollpersonal in der Testphase aufgefallen sind. Die anschließende ergonomische Untersuchung ergab, dass Optimierungsbedarf bezüglich der der Bediensoftware für das BAG-Kontrollpersonal besteht. Verbesserungsmöglichkeiten werden zum Beispiel in der Bildqualität, dem Bildausschnitt und der Verringerung der Anzahl an Kamerabildern auf dem Bildschirm, sowie der Erfassung und Dokumentation gesehen. Die parallel ablaufende technische Bewertung des Gesamtsystems legte Verbesserungspotenzial an den einzelnen Standorten offen und sprach Empfehlungen zum weiteren Ausbau der Pilotstandorte aus. Für den flächendeckenden Ausbau der Ausleittechnik werden die Standorte für eine mögliche technische Aufrüstung nach bestimmten Eigenschaften ausgewählt, die in einem Gesamtkriterienkatalog zusammengefasst wurden. Die Einschätzung zur zukünftigen Entwicklung der Ausleittechnik ergab, dass eine digitale Kommunikationsverbindung zwischen Bediensoftware und Lkw eine Verbesserung des Verkehrsflusses zur Folge hat. Die Informationen, welche die Ausleittafeln anzeigen würden, könnten direkt an den Bordcomputer des zu ausleitenden Fahrzeugs übermittelt werden, um eine gezieltere Ausleitung durchzuführen. N2 - The aim of the project was to evaluate a technical diversion method for vehicles at control points within the scope of stationary controls of the Federal Office for Goods Transport (BAG) in order to replace manual rejection by control personnel in the future. The technology, consisting of an operating station, camera technology and a control unit, was installed at five locations throughout Germany: Control station, camera technology and LED motorway exit display, was tested at five locations throughout Germany to enable the safe diversion of vehicles from motorways. The software used transmits the number plates, which were previously recorded by a camera system, and then forwards them, including a vehicle image, to the control personnel. In principle, it is possible to divert vehicles in batches or individually. At the pilot site in Sophienberg, Bavaria, empirical studies were carried out on the safety and functionality of the guidance technology, and in addition, vehicle operators were questioned across all sites regarding the design and presentation of the LED motorway exit display. A survey of the control personnel confirmed the higher level of safety during the technical diversion and identified aspects that the control personnel noticed during the test phase. The subsequent ergonomic study showed that there is a need for optimisation of the operating software for the BAG control staff. Possibilities for improvement are seen, for example, in the image quality, the image detail and the reduction of the number of camera images on the screen, as well as the recording and documentation. The parallel technical evaluation of the overall system revealed potential for improvement at the individual sites and made recommendations for further expansion of the pilot sites. For the network wide expansion of the system, the locations for a possible installation were selected according to certain characteristics, which were summarised in an overall catalogue of criteria. The assessment of the future development of the technical diversion method showed that a digital communication link between the operating software and the truck would result in an improvement of the traffic flow. The information that would be displayed by the LED motorway exit displays could be transmitted directly to the on-board computer of the vehicle to be diverted in order to carry out a more targeted diversion. T3 - Berichte der Bundesanstalt für Straßenwesen, Reihe V: Verkehrstechnik - 371 KW - Evaluierung KW - Standkontrolle KW - Güterverkehr KW - Evaluation KW - stationary controls KW - Freight transport Y1 - 2023 UR - https://bast.opus.hbz-nrw.de/frontdoor/index/index/docId/2782 UR - https://nbn-resolving.org/urn:nbn:de:hbz:opus-bast-27829 SN - 978-3-95606-732-7 SN - 0943-9331 N1 - Bericht zum Forschungsprojekt 03.0541 (Anlage 2) Wissenschaftliche Begleitung des digitalen Testfelds auf der A9 zwischen München und Nürnberg Fachbetreuung Karen Scharnigg Referat Verkehrsbeeinflussung und Straßenbetrieb PB - Fachverlag NW in der Carl Ed. Schünemann KG CY - Bremen ER -